Simulation-Based Study of Earthing Switch and Interrupter on Dominion Energy's Compact Corridor

Dominion Energy is installing new transmission lines to meet the increasing load demand. In a corridor spanning over 55 kilometers, a new 500kV/230kV monopole structure will replace existing structures. This structure will accommodate more than 20 existing and newly installed transmission lines. Up to five transmission lines can be placed within the 57-meter span of the corridor. Due to the corridor's long-distance and narrow width, induced voltage and current on de-energized lines will significantly increase, resulting in extended arc reach during current interruption. To ensure field crew safety, earthing switches and interrupters need to be installed to interrupt induced resistive and/or capacitive currents. This paper summarizes the results of a Dominion study of earthing switches and interrupters. Using PSCAD simulation, we analyzed induced voltage and current in the compact corridor and estimated arc reach, which informed the need for earthing switches. Transient recovery voltage simulations were also studied to evaluate the interrupters' capacity.

Authors

Publication Details

Journal
IEEE Transactions on Industry Applications
Published
2025-01-01
DOI
https://doi.org/10.1109/tia.2025.3618821
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation-Based Study of Earthing Switch and Interrupter on Dominion Energy's Compact Corridor

Andrea Pinceti, Lung‐An Lee, K Hannah, Katelynn A. Vance et al.
IEEE Transactions on Industry Applications
Power Systems and Technologies
article

Simulation-Based Study of Earthing Switch and Interrupter on Dominion Energy's Compact Corridor

Andrea Pinceti, Lung‐An Lee, K Hannah, Katelynn A. Vance, Ibukunoluwa O. Korede IBUKUNOLUWA
article en

Abstract

Dominion Energy is installing new transmission lines to meet the increasing load demand. In a corridor spanning over 55 kilometers, a new 500kV/230kV monopole structure will replace existing structures. This structure will accommodate more than 20 existing and newly installed transmission lines. Up to five transmission lines can be placed within the 57-meter span of the corridor. Due to the corridor's long-distance and narrow width, induced voltage and current on de-energized lines will significantly increase, resulting in extended arc reach during current interruption. To ensure field crew safety, earthing switches and interrupters need to be installed to interrupt induced resistive and/or capacitive currents. This paper summarizes the results of a Dominion study of earthing switches and interrupters. Using PSCAD simulation, we analyzed induced voltage and current in the compact corridor and estimated arc reach, which informed the need for earthing switches. Transient recovery voltage simulations were also studied to evaluate the interrupters' capacity.

IEEE Transactions on Industry Applications
Openalex Percentile: Top 72%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.