Geotechnical challenges and measurement programme in the exploration tunnel for the Coire Glas pumped storage power plant

Abstract SSE Renewables is one of the UK's leading renewable energy developers and plans to build the first pumped storage power plant in over 40 years with the Coire Glas project. The fully underground facility at Loch Lochy in the Scottish Highlands will have a capacity of 1300 MW and a storage capacity of 30 GWh, which will more than double the UK's current storage resources. In preparation, geotechnical investigations began in 2022 under the name “Coire Glas Exploratory Works”. STRABAG UK Ltd was awarded the contract following a public tender and work began in November 2022. A major part of the project was the construction of an initial 0.9 km long exploratory tunnel, the length of which was extended to 1.2 km during the course of the work. The aim of the investigations was to record the geological and hydrological conditions in order to safeguard the planning of underground structures such as pressure shafts, turbine and transformer caverns and access tunnels.

Authors

Institutions

Publication Details

Journal
Geomechanics and Tunnelling
Published
2025-10-01
DOI
https://doi.org/10.1002/geot.70001
Primary Topic
Geophysical Methods and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Geotechnical challenges and measurement programme in the exploration tunnel for the Coire Glas pumped storage power plant

Johann Hechenbichler, Johann Golser, Daniel Porubsky
Geomechanics and Tunnelling
Geophysical Methods and Applications
article

Geotechnical challenges and measurement programme in the exploration tunnel for the Coire Glas pumped storage power plant

Johann Hechenbichler, Johann Golser, Daniel Porubsky
article en

Abstract

Abstract SSE Renewables is one of the UK's leading renewable energy developers and plans to build the first pumped storage power plant in over 40 years with the Coire Glas project. The fully underground facility at Loch Lochy in the Scottish Highlands will have a capacity of 1300 MW and a storage capacity of 30 GWh, which will more than double the UK's current storage resources. In preparation, geotechnical investigations began in 2022 under the name “Coire Glas Exploratory Works”. STRABAG UK Ltd was awarded the contract following a public tender and work began in November 2022. A major part of the project was the construction of an initial 0.9 km long exploratory tunnel, the length of which was extended to 1.2 km during the course of the work. The aim of the investigations was to record the geological and hydrological conditions in order to safeguard the planning of underground structures such as pressure shafts, turbine and transformer caverns and access tunnels.

Geomechanics and TunnellingVol. 18(5)
Forschungszentrum Telekommunikation Wien (AT), Nippon Sheet Glass (United Kingdom) (GB), Scan Messtechnik (Austria) (AT)
Openalex Percentile: Top 66%
Geophysical Methods and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.