Investigation effect of metro entrance and exit construction on pedestrian overpass safety using numerical modelling and simulation

Due to the complex working conditions of deep burial, proximity, and multiple interferences unique to subway engineering, the construction process inevitably causes additional deformation or even local damage to adjacent existing structures. In order to systematically study the settlement of pedestrian overpass foundation and deformation mechanism of upper structure caused by the construction of a certain subway entrance and exit, this paper takes the structural load characteristics and construction sequence of the subway entrance and exit as the starting point, integrates regional traffic organization and on-site construction constraints, and constructs a three-dimensional dynamic construction numerical model. The displacement response of pedestrian overpass foundation during the entire excavation and support loading process was accurately simulated using nonlinear coupling algorithm. The final results show that the established support system and construction parameter control provided best values in terms of horizontal and vertical displacements. The maximum horizontal displacement of the pedestrian overpass pile foundation induced by subway entrance and exit construction is 0.3 mm. The maximum vertical displacement of the main span pile foundation is 1.9 mm. Both values are considered lower than the standard limits, including the allowable total settlement value of the pile foundation of 127 mm and the horizontal displacement limit of the pile foundation of 31mm. The above results quantitatively verify the "controllability" of the impact of subway entrance and exit construction on the structural safety of pedestrian overpasses, which can provide theoretical basis and technical paradigm for risk assessment and dynamic control similar to adjacent construction.

Authors

Institutions

Publication Details

Journal
Research on Engineering Structures and Materials
Published
2025-01-01
DOI
https://doi.org/10.17515/resm2025-1084st0812rs
Primary Topic
Evacuation and Crowd Dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigation effect of metro entrance and exit construction on pedestrian overpass safety using numerical modelling and simulation

Boi-Yee Liao, Ke Ji
Research on Engineering Structures and Materials
Evacuation and Crowd Dynamics
article

Investigation effect of metro entrance and exit construction on pedestrian overpass safety using numerical modelling and simulation

Boi-Yee Liao, Ke Ji
article en

Abstract

Due to the complex working conditions of deep burial, proximity, and multiple interferences unique to subway engineering, the construction process inevitably causes additional deformation or even local damage to adjacent existing structures. In order to systematically study the settlement of pedestrian overpass foundation and deformation mechanism of upper structure caused by the construction of a certain subway entrance and exit, this paper takes the structural load characteristics and construction sequence of the subway entrance and exit as the starting point, integrates regional traffic organization and on-site construction constraints, and constructs a three-dimensional dynamic construction numerical model. The displacement response of pedestrian overpass foundation during the entire excavation and support loading process was accurately simulated using nonlinear coupling algorithm. The final results show that the established support system and construction parameter control provided best values in terms of horizontal and vertical displacements. The maximum horizontal displacement of the pedestrian overpass pile foundation induced by subway entrance and exit construction is 0.3 mm. The maximum vertical displacement of the main span pile foundation is 1.9 mm. Both values are considered lower than the standard limits, including the allowable total settlement value of the pile foundation of 127 mm and the horizontal displacement limit of the pile foundation of 31mm. The above results quantitatively verify the "controllability" of the impact of subway entrance and exit construction on the structural safety of pedestrian overpasses, which can provide theoretical basis and technical paradigm for risk assessment and dynamic control similar to adjacent construction.

Research on Engineering Structures and Materials
Krirk University (TH)
Openalex Percentile: Top 66%
Evacuation and Crowd Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.