STUDI KASUS PERBANDINGAN PRODUKTIVITAS PEMODELANBIM: PRECAST VS TRADISIONAL

Productivity in Building Information Modeling (BIM) modeling plays a key role in project efficiency. However, the comparison between precast and traditional methods is still rarely studied. This research investigates the productivity comparison between BIM modeling methods and traditional construction execution on the Rumah Sakit Mitra Pumbon Subang project. The study uses a descriptive quantitative approach with data collected through 3D modeling (Autodesk Revit), scheduling (Microsoft Project), and 4D simulation (Autodesk Navisworks). The results show that BIM modeling requires more time (28 days) compared to the precast method (41 days) due to design complexity and more detailed object modeling in Revit compared to traditional CAD drawings. Meanwhile, the traditional construction method takes longer (153 days) compared to the precast method (137 days), due to the standardization advantages of precast work. In terms of material needs, BIM provides more precise calculations using the "Duplicate with Full Properties" and "Rebar Template Library" features in Revit. In conclusion, BIM modeling takes longer, but offers better precision and physical efficiency. This research emphasizes the importance of selecting the appropriate modeling method for optimal construction performance.

Authors

Institutions

Publication Details

Journal
CRANE Civil Engineering Research Journal
Published
2025-10-04
DOI
https://doi.org/10.34010/crane.v6i2.16202
Primary Topic
Agriculture and Agroindustry Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

STUDI KASUS PERBANDINGAN PRODUKTIVITAS PEMODELANBIM: PRECAST VS TRADISIONAL

Reza Rahardian, FALDERIKA FALDERIKA, Yongki Alexander Tanne, Haromi Ma’mun et al.
CRANE Civil Engineering Research Journal
Agriculture and Agroindustry Studies
article

STUDI KASUS PERBANDINGAN PRODUKTIVITAS PEMODELANBIM: PRECAST VS TRADISIONAL

Reza Rahardian, FALDERIKA FALDERIKA, Yongki Alexander Tanne, Haromi Ma’mun, Naimatunnisa, Belly Belly Saptiansyah
article en

Abstract

Productivity in Building Information Modeling (BIM) modeling plays a key role in project efficiency. However, the comparison between precast and traditional methods is still rarely studied. This research investigates the productivity comparison between BIM modeling methods and traditional construction execution on the Rumah Sakit Mitra Pumbon Subang project. The study uses a descriptive quantitative approach with data collected through 3D modeling (Autodesk Revit), scheduling (Microsoft Project), and 4D simulation (Autodesk Navisworks). The results show that BIM modeling requires more time (28 days) compared to the precast method (41 days) due to design complexity and more detailed object modeling in Revit compared to traditional CAD drawings. Meanwhile, the traditional construction method takes longer (153 days) compared to the precast method (137 days), due to the standardization advantages of precast work. In terms of material needs, BIM provides more precise calculations using the "Duplicate with Full Properties" and "Rebar Template Library" features in Revit. In conclusion, BIM modeling takes longer, but offers better precision and physical efficiency. This research emphasizes the importance of selecting the appropriate modeling method for optimal construction performance.

CRANE Civil Engineering Research JournalVol. 6(2)
Calvin University (KR), Universitas Komputer Indonesia (ID)
Openalex Percentile: Top 58%
Agriculture and Agroindustry Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.