Activation of a dead well by injection of hot steam

In the context of oil and gas extraction, a dead well refers to a well that has ceased to produce hydrocarbons.This can occur because the reservoir has been depleted, the pressure has dropped too low to allow for extraction, or there are technical issues such as blockages or equipment failure.The main purpose of this paper is to activate the death well called K22 (for confidential reasons) by injecting hot steam into the reservoir to reduce the viscosity of oil and increase the production rate.PVT, reservoir, well, completion and injection data are entered via prosper and Reveal software's in order to analyze the performance of the initial well, to implement the hot steam injection method and to analyze the performance of the well K22 after the injection of hot steam using the nodal analysis method.The results initially obtained show that well K22 does not produce.To solve this problem, the injection of hot steam method provides from the nodal analysis for a liquid production rate of 2200 STB/day and a critical pressure of 2337.78 psi where the production rate of oil is 2187.8STB/day, the water production rate is 21.1 STB/day and the gas production rate is 0.10894 STB/day for water cut of 0.92 %.The hot steam injection method is appropriate to put in production in well K22 because it reduces the density of the oil which facilitates its flow towards the production well, even though it does not completely solve the problem of water.Therefore, it maximizes the oil production and it allows a profitability of $ 3158366.721with a return on investment after 3 months and 3 days for 4 years of production.This means that it is possible to recover all the initial cost of exploitation by steam injection within 3 months and 3 days with the production still profitable for up to 4 years.

Authors

Publication Details

Journal
Iraqi journal of oil and gas researches
Published
2024-10-01
DOI
https://doi.org/10.55699/ijogr.2024.0402.1062
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Activation of a dead well by injection of hot steam

Denis Tcheukam Toko, Pierre Kisito Talla, Jules Metsebo, Colins Leprince Kombou et al.
Iraqi journal of oil and gas researches
Oil and Gas Production Techniques
article

Activation of a dead well by injection of hot steam

Denis Tcheukam Toko, Pierre Kisito Talla, Jules Metsebo, Colins Leprince Kombou, Nestor Tsamo, Aline Flore Pejurap Foundikou
article en

Abstract

In the context of oil and gas extraction, a dead well refers to a well that has ceased to produce hydrocarbons.This can occur because the reservoir has been depleted, the pressure has dropped too low to allow for extraction, or there are technical issues such as blockages or equipment failure.The main purpose of this paper is to activate the death well called K22 (for confidential reasons) by injecting hot steam into the reservoir to reduce the viscosity of oil and increase the production rate.PVT, reservoir, well, completion and injection data are entered via prosper and Reveal software's in order to analyze the performance of the initial well, to implement the hot steam injection method and to analyze the performance of the well K22 after the injection of hot steam using the nodal analysis method.The results initially obtained show that well K22 does not produce.To solve this problem, the injection of hot steam method provides from the nodal analysis for a liquid production rate of 2200 STB/day and a critical pressure of 2337.78 psi where the production rate of oil is 2187.8STB/day, the water production rate is 21.1 STB/day and the gas production rate is 0.10894 STB/day for water cut of 0.92 %.The hot steam injection method is appropriate to put in production in well K22 because it reduces the density of the oil which facilitates its flow towards the production well, even though it does not completely solve the problem of water.Therefore, it maximizes the oil production and it allows a profitability of $ 3158366.721with a return on investment after 3 months and 3 days for 4 years of production.This means that it is possible to recover all the initial cost of exploitation by steam injection within 3 months and 3 days with the production still profitable for up to 4 years.

Iraqi journal of oil and gas researchesVol. 4(2)
Openalex Percentile: Top 61%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Activation of a dead well by injection of hot steam — Denis Tcheukam Toko, Pierre Kisito Talla, et al. · Iraqi journal of oil and gas researches (2024) | TGRS Research Map | TGRS