Initial Forensic Evaluation of a Dry-Process Rubber-Modified Asphalt Pavement

The Additive Group (AG) experiment at the National Center for Asphalt Technology (NCAT) Test Track includes a section paved with a dry-process rubber-modified asphalt mixture (GTRDry) which has displayed severe levels of cracking after 10 million equivalent single-axle loads (ESAL) of accelerated trafficking. In the same period, the styrene–butadiene–styrene (SBS) modified control mixture displayed no cracking. Both mixtures displayed similar laboratory evaluated dynamic modulus |E*| and fatigue properties. The objective of this investigation was to determine the cause of the unexpected cracking observed in the GTRDry test section via forensic analysis, laboratory data, measured structural responses, and structural simulation. It was found that GTRDry had significantly lower foundation support relative to the control, and its average temperature-corrected asphalt concrete (AC) modulus (E 68 ) was lower than expected (based on the results of |E*| testing). Both factors contributed to the high tensile strains at the bottom of the AC layer (double those of the control). This was assumed to be the sole cause of the GTRDry cracking (a traditional bottom-up fatigue cracking mechanism), until forensic coring revealed mid-depth, horizontal cracking, prompting structural simulations via WESLEA. The results indicated that the lower AC and support moduli of the GTRDry section resulted in higher flexural strain responses. Peak shear stresses occurred near the location of mid-depth cracking; however, the magnitudes were found to be independent of the layer moduli, remaining relatively similar between the two sections. It was, therefore, concluded that the paved N1 (GTRDry) mixture was potentially more susceptible to horizontal cracking and bottom-up fatigue cracking distresses than the SBS-modified control.

Authors

Institutions

Publication Details

Journal
Transportation Research Record Journal of the Transportation Research Board
Published
2025-10-04
DOI
https://doi.org/10.1177/03611981251359283
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Initial Forensic Evaluation of a Dry-Process Rubber-Modified Asphalt Pavement

Samina Samrose, Carolina Rodezno, David H. Timm, Matthew Kmetz
Transportation Research Record Journal of the Transportation Research Board
Infrastructure Maintenance and Monitoring
article

Initial Forensic Evaluation of a Dry-Process Rubber-Modified Asphalt Pavement

Samina Samrose, Carolina Rodezno, David H. Timm, Matthew Kmetz
article en

Abstract

The Additive Group (AG) experiment at the National Center for Asphalt Technology (NCAT) Test Track includes a section paved with a dry-process rubber-modified asphalt mixture (GTRDry) which has displayed severe levels of cracking after 10 million equivalent single-axle loads (ESAL) of accelerated trafficking. In the same period, the styrene–butadiene–styrene (SBS) modified control mixture displayed no cracking. Both mixtures displayed similar laboratory evaluated dynamic modulus |E*| and fatigue properties. The objective of this investigation was to determine the cause of the unexpected cracking observed in the GTRDry test section via forensic analysis, laboratory data, measured structural responses, and structural simulation. It was found that GTRDry had significantly lower foundation support relative to the control, and its average temperature-corrected asphalt concrete (AC) modulus (E 68 ) was lower than expected (based on the results of |E*| testing). Both factors contributed to the high tensile strains at the bottom of the AC layer (double those of the control). This was assumed to be the sole cause of the GTRDry cracking (a traditional bottom-up fatigue cracking mechanism), until forensic coring revealed mid-depth, horizontal cracking, prompting structural simulations via WESLEA. The results indicated that the lower AC and support moduli of the GTRDry section resulted in higher flexural strain responses. Peak shear stresses occurred near the location of mid-depth cracking; however, the magnitudes were found to be independent of the layer moduli, remaining relatively similar between the two sections. It was, therefore, concluded that the paved N1 (GTRDry) mixture was potentially more susceptible to horizontal cracking and bottom-up fatigue cracking distresses than the SBS-modified control.

Transportation Research Record Journal of the Transportation Research BoardVol. 2680(1)
Auburn University (US)
Openalex Percentile: Top 71%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.