Contingency cost modelling by MATLAB fuzzy toolbox for natural gas maintenance contracts

The agreed-upon operational contingency cost is a key element of maintenance contracts, especially for the Natural Gas Reduction and Metering Stations. Disputes, claims, and failure to fulfil contractual obligations often stem from poor estimation of the risks associated with contingency costs. Currently, there are no standard rules or methods for companies to estimate these costs. As a result, some practices rely on rough estimates as a percentage of the total contract value without conducting any risk analysis. Others base their estimates on opinions from subject matter experts. This paper addresses the issue of improper contingency cost estimation by: 1) identifying the most influential factors affecting the value of maintenance contracts in the natural gas sector, and 2) developing a fuzzy logic risk analysis model to predict contingency costs based on the specific circumstances of contract signing. The effectiveness of this approach was validated through a real case study of an existing natural gas maintenance contract in Egypt. The results revealed that the most impactful factors were economic, contractual, operational, construction, and regulatory risks, while market and legal risks had the least impact. In addition, the findings show that the proposed model predicts the contingency cost with nearly 94.69% accuracy.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Forensic Engineering
Published
2025-10-03
DOI
https://doi.org/10.1680/jfoen.25.00017
Primary Topic
Modeling, Simulation, and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Contingency cost modelling by MATLAB fuzzy toolbox for natural gas maintenance contracts

Ahmed Ehab, Mohamed Abdelaal, Sandy Mahfouz
Proceedings of the Institution of Civil Engineers - Forensic Engineering
Modeling, Simulation, and Optimization
article

Contingency cost modelling by MATLAB fuzzy toolbox for natural gas maintenance contracts

Ahmed Ehab, Mohamed Abdelaal, Sandy Mahfouz
article en

Abstract

The agreed-upon operational contingency cost is a key element of maintenance contracts, especially for the Natural Gas Reduction and Metering Stations. Disputes, claims, and failure to fulfil contractual obligations often stem from poor estimation of the risks associated with contingency costs. Currently, there are no standard rules or methods for companies to estimate these costs. As a result, some practices rely on rough estimates as a percentage of the total contract value without conducting any risk analysis. Others base their estimates on opinions from subject matter experts. This paper addresses the issue of improper contingency cost estimation by: 1) identifying the most influential factors affecting the value of maintenance contracts in the natural gas sector, and 2) developing a fuzzy logic risk analysis model to predict contingency costs based on the specific circumstances of contract signing. The effectiveness of this approach was validated through a real case study of an existing natural gas maintenance contract in Egypt. The results revealed that the most impactful factors were economic, contractual, operational, construction, and regulatory risks, while market and legal risks had the least impact. In addition, the findings show that the proposed model predicts the contingency cost with nearly 94.69% accuracy.

Proceedings of the Institution of Civil Engineers - Forensic EngineeringVol. 178(4)
Arab Academy for Science, Technology, and Maritime Transport (EG), Badr University in Cairo (EG)
Openalex Percentile: Top 66%
Modeling, Simulation, and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Contingency cost modelling by MATLAB fuzzy toolbox for natural gas maintenance contracts — Ahmed Ehab, Mohamed Abdelaal, et al. · Proceedings of the Institution of Civil Engineers - Forensic Engineering (2025) | TGRS Research Map | TGRS