Thames Tideway Tunnel: delivering an environmental, economic and social legacy

The ambition of the Thames Tideway Tunnel project for a sustainable legacy was captured by the company’s vision statement to reconnect London with the River Thames. In addition, the project aimed to set new industry standards to raise the bar for projects that would follow. Tideway set out a legacy programme organised under five themes, with 54 measurable commitments and with delivery embedded into its construction contracts. The programme was tracked for its contribution to the UN Sustainable Development Goals and its social value was assessed. This paper describes how wider legacy value, in addition to the core benefit of a cleaner river, was designed into the project. It also outlines how long-term benefits were delivered under key themes to ensure additional benefits for the local environment and for local communities, as well as the project’s own people and external partners. It should be read alongside previous specific papers from the Thames Tideway Tunnel project on health, safety and wellbeing legacy and on measuring wider social impact, and the specific paper in this issue on delivering world-class public realm.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2025-10-03
DOI
https://doi.org/10.1680/jcien.25.00020
Citations
4
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
5.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thames Tideway Tunnel: delivering an environmental, economic and social legacy

John Sage
4 citations
Proceedings of the Institution of Civil Engineers - Civil Engineering
Geotechnical Engineering and Analysis
5.21
article

Thames Tideway Tunnel: delivering an environmental, economic and social legacy

John Sage
article en
4 citations

Abstract

The ambition of the Thames Tideway Tunnel project for a sustainable legacy was captured by the company’s vision statement to reconnect London with the River Thames. In addition, the project aimed to set new industry standards to raise the bar for projects that would follow. Tideway set out a legacy programme organised under five themes, with 54 measurable commitments and with delivery embedded into its construction contracts. The programme was tracked for its contribution to the UN Sustainable Development Goals and its social value was assessed. This paper describes how wider legacy value, in addition to the core benefit of a cleaner river, was designed into the project. It also outlines how long-term benefits were delivered under key themes to ensure additional benefits for the local environment and for local communities, as well as the project’s own people and external partners. It should be read alongside previous specific papers from the Thames Tideway Tunnel project on health, safety and wellbeing legacy and on measuring wider social impact, and the specific paper in this issue on delivering world-class public realm.

Proceedings of the Institution of Civil Engineers - Civil EngineeringVol. 178(6)
Green Tide Turbines (United Kingdom) (GB)
Openalex Percentile: Top 4%
Geotechnical Engineering and Analysis
5.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Thames Tideway Tunnel: delivering an environmental, economic and social legacy — John Sage · Proceedings of the Institution of Civil Engineers - Civil Engineering (2025) | TGRS Research Map | TGRS