EVALUASI KAPASITAS DIMENSI KOLAM STABILISASI INSTALASI PENGOLAHAN AIR LIMBAH BOJONGSOANG BANDUNG

Bojongsoang wastewater treatment plant (WWTP) has been operating since 1992 which treats domestic wastewater from 17 sub-district of Bandung City. Bandung has potential challenges, in population growth. Population growth will increase fresh water consumption that result In increasing the quantity of domestic wastewater. The purpose of this study was to evaluate the capacity of the Bojongsoang WWTP stabilization pond, whether the existing pond capacity is sufficient for the projected population of 10 years to come by following the design of predetermined waste treatment parameters. The results of the study stated that the Bojongsoang WWTP must add volume of anaerobic pond as 23,132.8 m2 and volume of facultative pond 73,410 m2 so that the Bojongsoang WWTP continues to operate according to the parameter design of detailed technical SPLAD-T guidelines in 2018. Abstrak Instalasi pengolahan air limbah (IPAL) Bojongsoang beroperasi sejak tahun 1992, yang mengolah limbah domestik dari 17 kecamatan di Kota Bandung. Kota Bandung memiliki potensi sekaligus tantangan, yaitu berupa pertumbuhan penduduk. Pertumbuhan penduduk selalu berpotensi pada peningkatan kebutuhan air bersih dan juga peningkatan kuantitas air limbah domestik. Tujuan penelitian Ini adalah melakukan evaluasi pada kapasitas kolam stabilisasi IPAL bojongsoang, apakah kapasitas kolam yang ada masih mencukupi untuk proyeksi penduduk 10 tahun yang akan datang dengan mengikuti desain parameter pengolahan limbah yang sudah ditetapkan. Hasil penelitian menyatakan bahwa IPAL bojongsoang harus menambah kolam anaerob dengan volume 23.132,8 m2 dan kolam fakultatif dengan volume 73.410 m2 sehingga IPAL Bojongsoang tetap beroperasi sesuai desain parameter yang sesuai pedoman SPLAD-T teknik terinci tahun 2018.

Authors

Institutions

Publication Details

Journal
JMTS Jurnal Mitra Teknik Sipil
Published
2025-04-28
DOI
https://doi.org/10.24912/jmts.v8i2.31987
Citations
1
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EVALUASI KAPASITAS DIMENSI KOLAM STABILISASI INSTALASI PENGOLAHAN AIR LIMBAH BOJONGSOANG BANDUNG

Fransiska Yustiana, Almer Patuinanugrahan Shira Bhuwana
1 citations
JMTS Jurnal Mitra Teknik Sipil
Management and Optimization Techniques
2.23
article

EVALUASI KAPASITAS DIMENSI KOLAM STABILISASI INSTALASI PENGOLAHAN AIR LIMBAH BOJONGSOANG BANDUNG

Fransiska Yustiana, Almer Patuinanugrahan Shira Bhuwana
article en
1 citations

Abstract

Bojongsoang wastewater treatment plant (WWTP) has been operating since 1992 which treats domestic wastewater from 17 sub-district of Bandung City. Bandung has potential challenges, in population growth. Population growth will increase fresh water consumption that result In increasing the quantity of domestic wastewater. The purpose of this study was to evaluate the capacity of the Bojongsoang WWTP stabilization pond, whether the existing pond capacity is sufficient for the projected population of 10 years to come by following the design of predetermined waste treatment parameters. The results of the study stated that the Bojongsoang WWTP must add volume of anaerobic pond as 23,132.8 m2 and volume of facultative pond 73,410 m2 so that the Bojongsoang WWTP continues to operate according to the parameter design of detailed technical SPLAD-T guidelines in 2018. Abstrak Instalasi pengolahan air limbah (IPAL) Bojongsoang beroperasi sejak tahun 1992, yang mengolah limbah domestik dari 17 kecamatan di Kota Bandung. Kota Bandung memiliki potensi sekaligus tantangan, yaitu berupa pertumbuhan penduduk. Pertumbuhan penduduk selalu berpotensi pada peningkatan kebutuhan air bersih dan juga peningkatan kuantitas air limbah domestik. Tujuan penelitian Ini adalah melakukan evaluasi pada kapasitas kolam stabilisasi IPAL bojongsoang, apakah kapasitas kolam yang ada masih mencukupi untuk proyeksi penduduk 10 tahun yang akan datang dengan mengikuti desain parameter pengolahan limbah yang sudah ditetapkan. Hasil penelitian menyatakan bahwa IPAL bojongsoang harus menambah kolam anaerob dengan volume 23.132,8 m2 dan kolam fakultatif dengan volume 73.410 m2 sehingga IPAL Bojongsoang tetap beroperasi sesuai desain parameter yang sesuai pedoman SPLAD-T teknik terinci tahun 2018.

JMTS Jurnal Mitra Teknik Sipil
Institut Teknologi Nasional Malang (ID)
Openalex Percentile: Top 9%
Management and Optimization Techniques
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.