ANALISIS METODE EARNED VALUE UNTUK DURASI PENYELESAIAN PEMBANGUNAN PROYEK X DI KARAWANG

One of the main targets of project is success on time. Delays in construction projects can cause time and cost losses for parties such as contractors and owners. The earned value method was created to estimate the project completion time. Earned value management is one of the approaches developed as a tool for time management in a project. This study focuses on how to use earned value management to control the time and cost of the office and factory construction project in Karawang. The analysis in this study specifically discusses the delays and progress of the office and factory project, which has a planned duration of 44 weeks. The analysis using the earned value method yields predictions of the final project duration during the delay weeks and acceleration weeks. In the delay weeks from week 33 to week 37, the predicted final duration of the project exceeded the initial planned time. Meanwhile, in the acceleration weeks from week 38 to week 43, the predicted final duration of the project showed results less than the initial planned time. This delay was caused by fewer workers than planned, resulting in project delays, and during the acceleration weeks, additional workers were added to the project, leading to a good final duration prediction. Abstrak Salah satu ukuran utama keberhasilan proyek adalah waktu. Keterlambatan proyek konstruksi dapat menyebabkan kerugian waktu dan biaya bagi pihak-pihak seperti kontraktor dan owner. Metode Earned Value dibuat untuk memperkirakan waktu penyelesaian proyek. Earned Value management adalah salah satu pendekatan yang dikembangkan sebagai alat untuk melakukan manajemen waktu pada suatu proyek. Studi ini berfokus pada bagaimana menggunakan Earned Value management untuk mengendalikan waktu dan biaya proyek pembangunan kantor dan pabrik di Karawang. Analisis pada studi ini secara khusus membahas mengenai keterlambatan dan kemajuan dari proyek pabrik dan kantor yang memiliki durasi perencanaan selama 44 minggu. Analisis dengan menggunakan metode Earned Value mendapatkan hasil prediksi durasi akhir proyek pada minggu keterlambatan dan minggu percepatan. Pada minggu keterlambatan minggu ke-33 sampai minggu ke-37 prediksi durasi akhir proyek melebihi dari waktu rencana awal proyek. Sedangkan pada minggu percepatan minggu ke-38 sampai minggu ke-43 prediksi durasi akhir proyek menunjukan hasil kurang dari rencana awal proyek. Keterlambatan ini disebabkan oleh pekerja kurang dari rencana sehingga proyek mengalami keterlambatan dan pada minggu percepatan pekerja di proyek ditambah dan menghasilkan prediksi durasi akhir yang baik.

Authors

Institutions

Publication Details

Journal
JMTS Jurnal Mitra Teknik Sipil
Published
2025-04-28
DOI
https://doi.org/10.24912/jmts.v8i2.33226
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS METODE EARNED VALUE UNTUK DURASI PENYELESAIAN PEMBANGUNAN PROYEK X DI KARAWANG

Arianti Sutandi, Basuki Anondho, Gervan Abraham Tanuwihardjo
JMTS Jurnal Mitra Teknik Sipil
Management and Optimization Techniques
article

ANALISIS METODE EARNED VALUE UNTUK DURASI PENYELESAIAN PEMBANGUNAN PROYEK X DI KARAWANG

Arianti Sutandi, Basuki Anondho, Gervan Abraham Tanuwihardjo
article en

Abstract

One of the main targets of project is success on time. Delays in construction projects can cause time and cost losses for parties such as contractors and owners. The earned value method was created to estimate the project completion time. Earned value management is one of the approaches developed as a tool for time management in a project. This study focuses on how to use earned value management to control the time and cost of the office and factory construction project in Karawang. The analysis in this study specifically discusses the delays and progress of the office and factory project, which has a planned duration of 44 weeks. The analysis using the earned value method yields predictions of the final project duration during the delay weeks and acceleration weeks. In the delay weeks from week 33 to week 37, the predicted final duration of the project exceeded the initial planned time. Meanwhile, in the acceleration weeks from week 38 to week 43, the predicted final duration of the project showed results less than the initial planned time. This delay was caused by fewer workers than planned, resulting in project delays, and during the acceleration weeks, additional workers were added to the project, leading to a good final duration prediction. Abstrak Salah satu ukuran utama keberhasilan proyek adalah waktu. Keterlambatan proyek konstruksi dapat menyebabkan kerugian waktu dan biaya bagi pihak-pihak seperti kontraktor dan owner. Metode Earned Value dibuat untuk memperkirakan waktu penyelesaian proyek. Earned Value management adalah salah satu pendekatan yang dikembangkan sebagai alat untuk melakukan manajemen waktu pada suatu proyek. Studi ini berfokus pada bagaimana menggunakan Earned Value management untuk mengendalikan waktu dan biaya proyek pembangunan kantor dan pabrik di Karawang. Analisis pada studi ini secara khusus membahas mengenai keterlambatan dan kemajuan dari proyek pabrik dan kantor yang memiliki durasi perencanaan selama 44 minggu. Analisis dengan menggunakan metode Earned Value mendapatkan hasil prediksi durasi akhir proyek pada minggu keterlambatan dan minggu percepatan. Pada minggu keterlambatan minggu ke-33 sampai minggu ke-37 prediksi durasi akhir proyek melebihi dari waktu rencana awal proyek. Sedangkan pada minggu percepatan minggu ke-38 sampai minggu ke-43 prediksi durasi akhir proyek menunjukan hasil kurang dari rencana awal proyek. Keterlambatan ini disebabkan oleh pekerja kurang dari rencana sehingga proyek mengalami keterlambatan dan pada minggu percepatan pekerja di proyek ditambah dan menghasilkan prediksi durasi akhir yang baik.

JMTS Jurnal Mitra Teknik Sipil
Tarumanagara University (ID)
Openalex Percentile: Top 60%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.