Buildability momentum across project stages: empirical insights from RIBA plan of work towards sustainable construction

Buildability deals with the optimal integration of construction knowledge at various project stages to achieve the overall project objectives. Incorporation of buildability improves the construction project performance in terms of its cost, quality, productivity, safety, and results in early completion. This study investigates how buildability considerations manifest throughout the RIBA Plan of Work stages, from Strategic Definition-Stage to In Use-Stage7. Using a qualitative methodology, this research draws on semi-structured interviews with a cross-section of industry stakeholders, including designers, contractors, project managers, consultants, and specialists, to uncover how knowledge, stakeholder input, and decision-making practices influence buildability at each stage. Thematic analysis embedded in phenomenological research philosophy was adopted as the data analysis method. The findings show that buildability is often underdeveloped in early design due to limited contractor involvement but becomes more prominent in Spatial Coordination and Technical Design stages through logistics, sequencing, and specialist input. Handover and Use Stages underscore the overlooked importance of commissioning, handover, and facilities management for ensuring project continuity and usability. The study introduces the Buildability Momentum Curve, a visual framework mapping the rising and falling influence of buildability insights across all RIBA stages. This curve underscores the importance of early integration and sustained knowledge flow to mitigate fragmentation and performance inefficiencies. The findings have practical implications for procurement strategies, project governance, and knowledge management systems. By conceptualising buildability as a dynamic and evolving construct, the paper advocates for a more integrated and anticipatory approach to design and delivery that spans the entirety of the project lifecycle.

Authors

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.31705/wcs.2025.25
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Buildability momentum across project stages: empirical insights from RIBA plan of work towards sustainable construction

Udayangani Kulatunga, P.L.I. Wimalaratne
1 citations
Construction Project Management and Performance
2.11
article

Buildability momentum across project stages: empirical insights from RIBA plan of work towards sustainable construction

Udayangani Kulatunga, P.L.I. Wimalaratne
article en
1 citations

Abstract

Buildability deals with the optimal integration of construction knowledge at various project stages to achieve the overall project objectives. Incorporation of buildability improves the construction project performance in terms of its cost, quality, productivity, safety, and results in early completion. This study investigates how buildability considerations manifest throughout the RIBA Plan of Work stages, from Strategic Definition-Stage to In Use-Stage7. Using a qualitative methodology, this research draws on semi-structured interviews with a cross-section of industry stakeholders, including designers, contractors, project managers, consultants, and specialists, to uncover how knowledge, stakeholder input, and decision-making practices influence buildability at each stage. Thematic analysis embedded in phenomenological research philosophy was adopted as the data analysis method. The findings show that buildability is often underdeveloped in early design due to limited contractor involvement but becomes more prominent in Spatial Coordination and Technical Design stages through logistics, sequencing, and specialist input. Handover and Use Stages underscore the overlooked importance of commissioning, handover, and facilities management for ensuring project continuity and usability. The study introduces the Buildability Momentum Curve, a visual framework mapping the rising and falling influence of buildability insights across all RIBA stages. This curve underscores the importance of early integration and sustained knowledge flow to mitigate fragmentation and performance inefficiencies. The findings have practical implications for procurement strategies, project governance, and knowledge management systems. By conceptualising buildability as a dynamic and evolving construct, the paper advocates for a more integrated and anticipatory approach to design and delivery that spans the entirety of the project lifecycle.

Openalex Percentile: Top 10%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Buildability momentum across project stages: empirical insights from RIBA plan of work towards sustainable construction — Udayangani Kulatunga, P.L.I. Wimalaratne · (2025) | TGRS Research Map | TGRS