Rancangan Sump Berdasarkan Arah Kemajuan Tambang

A sump is a water reservoir that functions to accommodate runoff water in the pit before the water is pumped. This study was conducted to determine the location plan and sump capacity based on the direction of mine progress and the actual estimation of runoff discharge that enters the pit at PT. Wahyu Murti Garuda Kencana, Central Kalimantan. There is a water problem that interferes with production activities because the actual sump dimensions are insufficient to accommodate the daily discharge of water that enters the sump. So that the impact on the mining front is flooded or there is waterlogging that disrupts mining activities. The progress of the mine is directed towards the north of the sump so that the distance and dimensions of the actual sump are ineffective and unable to accommodate the incoming water discharge in accordance with the direction of the mine progress due to the mining location in the pit which is easily submerged by water. The drainage condition at PT. Wahyu Murti Garuda Kencana uses the mine dewatering method which is a method of removing water that flows into the mining sump using a pump. Theoretically, by conducting direct research on the sump area of PT. Wahyu Murti Garuda Kencana, the actual sump dimensions are insufficient to accommodate the water discharge that enters the pit. The design carried out pays attention to the mining plan so that the sump design to be designed can be applied in the field in accordance with the mine design. The shape of the sump designed is a trapezoidal shape with dimensions of 80 m x 70 m cross-section, 74 m x 64 m bottom section, depth of 4 m and 55 degree tilt angle and a total sump volume capacity of 20,672 m3.

Authors

Institutions

Publication Details

Journal
JURAL RISET RUMPUN ILMU TEKNIK
Published
2025-10-03
DOI
https://doi.org/10.55606/jurritek.v4i3.6870
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rancangan Sump Berdasarkan Arah Kemajuan Tambang

Yunida Iashania, Noveriady Noveriady, Dedy Jupiter Sihombing
JURAL RISET RUMPUN ILMU TEKNIK
Geotechnical and construction materials studies
article

Rancangan Sump Berdasarkan Arah Kemajuan Tambang

Yunida Iashania, Noveriady Noveriady, Dedy Jupiter Sihombing
article en

Abstract

A sump is a water reservoir that functions to accommodate runoff water in the pit before the water is pumped. This study was conducted to determine the location plan and sump capacity based on the direction of mine progress and the actual estimation of runoff discharge that enters the pit at PT. Wahyu Murti Garuda Kencana, Central Kalimantan. There is a water problem that interferes with production activities because the actual sump dimensions are insufficient to accommodate the daily discharge of water that enters the sump. So that the impact on the mining front is flooded or there is waterlogging that disrupts mining activities. The progress of the mine is directed towards the north of the sump so that the distance and dimensions of the actual sump are ineffective and unable to accommodate the incoming water discharge in accordance with the direction of the mine progress due to the mining location in the pit which is easily submerged by water. The drainage condition at PT. Wahyu Murti Garuda Kencana uses the mine dewatering method which is a method of removing water that flows into the mining sump using a pump. Theoretically, by conducting direct research on the sump area of PT. Wahyu Murti Garuda Kencana, the actual sump dimensions are insufficient to accommodate the water discharge that enters the pit. The design carried out pays attention to the mining plan so that the sump design to be designed can be applied in the field in accordance with the mine design. The shape of the sump designed is a trapezoidal shape with dimensions of 80 m x 70 m cross-section, 74 m x 64 m bottom section, depth of 4 m and 55 degree tilt angle and a total sump volume capacity of 20,672 m3.

JURAL RISET RUMPUN ILMU TEKNIKVol. 4(3)
University of Palangka Raya (ID)
Openalex Percentile: Top 71%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.