Risk Prioritization of RC Buildings in Bitlis (Türkiye) in the Light of the 2023 Kahramanmaraş Earthquakes

Widespread casualties and property damage due to structural failures following devastating earthquakes have once again highlighted the critical significance of evaluating the seismic performance of existing buildings. In this context, a fundamental part of modern pre-disaster management is to evaluate the potential seismic risks of existing structures and implementing the necessary precautions. This study focuses on determining regional risk priorities using a rapid assessment methodology applied to a sample of reinforced-concrete (RC) structures in the Centre of Bitlis city, situated in the high-seismic-risk Lake Van Basin. Risk prioritization was made among the buildings based on the Turkish Rapid Assessment technique revised in 2019 for 100 different RC buildings with one to seven stories. The negative parameters utilized in this method were analyzed both in relation to the 6 February 2023, Kahramanmaraş earthquakes and the assessed building stock. Additionally, the study provides a comprehensive review of the existing building inventory across the region and offers recommendations for potential precautions to mitigate earthquake risks.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-10-02
DOI
https://doi.org/10.3390/buildings15193552
Citations
1
Primary Topic
earthquake and tectonic studies
Type
article
Field-Weighted Citation Impact
1.87

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Prioritization of RC Buildings in Bitlis (Türkiye) in the Light of the 2023 Kahramanmaraş Earthquakes

Ercan Işık, Mert Hamamcıoğlu
1 citations
Buildings
earthquake and tectonic studies
1.87
article

Risk Prioritization of RC Buildings in Bitlis (Türkiye) in the Light of the 2023 Kahramanmaraş Earthquakes

Ercan Işık, Mert Hamamcıoğlu
article en
1 citations

Abstract

Widespread casualties and property damage due to structural failures following devastating earthquakes have once again highlighted the critical significance of evaluating the seismic performance of existing buildings. In this context, a fundamental part of modern pre-disaster management is to evaluate the potential seismic risks of existing structures and implementing the necessary precautions. This study focuses on determining regional risk priorities using a rapid assessment methodology applied to a sample of reinforced-concrete (RC) structures in the Centre of Bitlis city, situated in the high-seismic-risk Lake Van Basin. Risk prioritization was made among the buildings based on the Turkish Rapid Assessment technique revised in 2019 for 100 different RC buildings with one to seven stories. The negative parameters utilized in this method were analyzed both in relation to the 6 February 2023, Kahramanmaraş earthquakes and the assessed building stock. Additionally, the study provides a comprehensive review of the existing building inventory across the region and offers recommendations for potential precautions to mitigate earthquake risks.

BuildingsVol. 15(19)
Bitlis Eren University (TR)
European Commission, Erasmus+
Openalex Percentile: Top 14%
earthquake and tectonic studies
1.87
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Prioritization of RC Buildings in Bitlis (Türkiye) in the Light of the 2023 Kahramanmaraş Earthquakes — Ercan Işık, Mert Hamamcıoğlu · Buildings (2025) | TGRS Research Map | TGRS