Effectiveness of Public Market Design and Construction Under A Public-Private Partnership In One Component City of Batangas

This study assessed the effectiveness of the design and construction of the Tanauan City Public Market in Batangas, completed in 2018 under a Public-Private Partnership (PPP) through a Design-Build-Transfer-Operate (DBTO) Agreement. Specifically, it evaluated four key dimensions: movement of people and vehicles, products and services offered, facilities and equipment provided, and business performance. Using a descriptive research design, a survey of 370 respondents—composed of stall owners/sellers and consumers—was conducted, supplemented with interviews and on-site validation. Results showed that the overall effectiveness of the market design and construction was rated “effective” (composite mean = 2.89). Business performance ranked highest, followed by the range of products and services, and accessibility for people and vehicles, while facilities and equipment obtained the lowest but still effective rating. The study also identified factors that affected market operations, including traffic congestion, presence of ambulant vendors, sanitation concerns, and maintenance issues in drainage and security systems. Statistical tests revealed significant relationships between perceived effectiveness and operational problems, indicating that addressing these challenges is vital to sustaining performance. The findings highlight how PPP arrangements can ease fiscal constraints of local governments, provide modern and functional facilities, and generate additional revenues while promoting local economic development. An action plan was proposed to enhance market management, infrastructure maintenance, and stakeholder engagement to ensure the long-term viability of the project.

Authors

Publication Details

Journal
Asia Pacific Journal of Management and Sustainable Development
Published
2025-04-01
DOI
https://doi.org/10.70979/vufa2323
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effectiveness of Public Market Design and Construction Under A Public-Private Partnership In One Component City of Batangas

Valter L Morada
Asia Pacific Journal of Management and Sustainable Development
Public-Private Partnership Projects
article

Effectiveness of Public Market Design and Construction Under A Public-Private Partnership In One Component City of Batangas

Valter L Morada
article en

Abstract

This study assessed the effectiveness of the design and construction of the Tanauan City Public Market in Batangas, completed in 2018 under a Public-Private Partnership (PPP) through a Design-Build-Transfer-Operate (DBTO) Agreement. Specifically, it evaluated four key dimensions: movement of people and vehicles, products and services offered, facilities and equipment provided, and business performance. Using a descriptive research design, a survey of 370 respondents—composed of stall owners/sellers and consumers—was conducted, supplemented with interviews and on-site validation. Results showed that the overall effectiveness of the market design and construction was rated “effective” (composite mean = 2.89). Business performance ranked highest, followed by the range of products and services, and accessibility for people and vehicles, while facilities and equipment obtained the lowest but still effective rating. The study also identified factors that affected market operations, including traffic congestion, presence of ambulant vendors, sanitation concerns, and maintenance issues in drainage and security systems. Statistical tests revealed significant relationships between perceived effectiveness and operational problems, indicating that addressing these challenges is vital to sustaining performance. The findings highlight how PPP arrangements can ease fiscal constraints of local governments, provide modern and functional facilities, and generate additional revenues while promoting local economic development. An action plan was proposed to enhance market management, infrastructure maintenance, and stakeholder engagement to ensure the long-term viability of the project.

Asia Pacific Journal of Management and Sustainable DevelopmentVol. 13(1)
Openalex Percentile: Top 61%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.