The Impact of Strategic Procurement on Cost Overruns and Delays in Petroleum Exploration and Production Projects

Cost overruns and project delays persist as significant challenges in petroleum exploration and production (E&P) projects, frequently resulting in reduced profitability, strained stakeholder relationships, and missed strategic objectives. This study investigates the impact of strategic procurement practices on mitigating cost and schedule risks in petroleum projects. Using a dataset of 120 projects, the study employs descriptive statistics, correlation analysis, and multiple regression modelling to evaluate the role of supplier relationship management (SRM), early supplier involvement, contract alignment, supplier qualification, and digital enablement in influencing project performance. The findings reveal that SRM and early supplier involvement significantly reduce cost overruns, while contract alignment demonstrates a marginal yet negative effect on cost growth. In terms of schedule performance, SRM, early involvement, contract alignment, and digital enablement all emerge as significant determinants of reduced delays, underscoring the importance of collaborative supplier engagement and digital transformation in project delivery. Project characteristics—particularly offshore location, project size, and contract type—were found to be critical drivers of both cost and schedule risks, with offshore and reimbursable-contract projects especially vulnerable to overruns and delays. The study contributes to both theory and practice by demonstrating how procurement strategies, when aligned with contextual project risks, can substantially improve project outcomes. It advances procurement literature within the petroleum sector by integrating strategic practices with performance metrics and extends the application of Transaction Cost Economics and the Resource-Based View in project management research. Practically, the study recommends strengthening supplier relationships, integrating suppliers early in the project lifecycle, adopting digital procurement platforms, and aligning contracts with project objectives. For risk-sensitive projects, particularly offshore and large-scale operations, targeted procurement governance and robust contracting strategies are essential. The findings reinforce the view that procurement is not merely a transactional activity but a strategic enabler of efficiency, reliability, and competitiveness in petroleum E&P projects.

Authors

Institutions

Publication Details

Journal
African Journal of Procurement, Logistics & Supply Chain Management.
Published
2025-09-22
DOI
https://doi.org/10.4314/ajplscm.v8i5.3
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Impact of Strategic Procurement on Cost Overruns and Delays in Petroleum Exploration and Production Projects

David Ackah, Kwasi Opoku Boadu
African Journal of Procurement, Logistics & Supply Chain Management.
Reservoir Engineering and Simulation Methods
article

The Impact of Strategic Procurement on Cost Overruns and Delays in Petroleum Exploration and Production Projects

David Ackah, Kwasi Opoku Boadu
article en

Abstract

Cost overruns and project delays persist as significant challenges in petroleum exploration and production (E&P) projects, frequently resulting in reduced profitability, strained stakeholder relationships, and missed strategic objectives. This study investigates the impact of strategic procurement practices on mitigating cost and schedule risks in petroleum projects. Using a dataset of 120 projects, the study employs descriptive statistics, correlation analysis, and multiple regression modelling to evaluate the role of supplier relationship management (SRM), early supplier involvement, contract alignment, supplier qualification, and digital enablement in influencing project performance. The findings reveal that SRM and early supplier involvement significantly reduce cost overruns, while contract alignment demonstrates a marginal yet negative effect on cost growth. In terms of schedule performance, SRM, early involvement, contract alignment, and digital enablement all emerge as significant determinants of reduced delays, underscoring the importance of collaborative supplier engagement and digital transformation in project delivery. Project characteristics—particularly offshore location, project size, and contract type—were found to be critical drivers of both cost and schedule risks, with offshore and reimbursable-contract projects especially vulnerable to overruns and delays. The study contributes to both theory and practice by demonstrating how procurement strategies, when aligned with contextual project risks, can substantially improve project outcomes. It advances procurement literature within the petroleum sector by integrating strategic practices with performance metrics and extends the application of Transaction Cost Economics and the Resource-Based View in project management research. Practically, the study recommends strengthening supplier relationships, integrating suppliers early in the project lifecycle, adopting digital procurement platforms, and aligning contracts with project objectives. For risk-sensitive projects, particularly offshore and large-scale operations, targeted procurement governance and robust contracting strategies are essential. The findings reinforce the view that procurement is not merely a transactional activity but a strategic enabler of efficiency, reliability, and competitiveness in petroleum E&P projects.

African Journal of Procurement, Logistics & Supply Chain Management.Vol. 8(5)
University of Cape Coast (GH)
Openalex Percentile: Top 66%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.