Analisis Kinerja Simpang Bersinyal Pada Ruas Jalan Trunojoyo Pamekasan (Km. 111 + 300) Dengan Metode PKJI

Pamekasan is a district that is currently developing, this is characterized by many large shops such as pizza hut, eiger, minisho, and gacoan noodles. This is because Pamekasan has a strategic location, where Pamekasan is located in the middle of Madura Island. The growth rate of vehicles in Pamekasan city is increasingly uncontrollable. The rapid growth of vehicles each year so that it can not keep up with the increase in road infrastructure, which causes congestion, especially at peak hours that have an impact on travel time and work effectiveness time. A signalized intersection is an intersection consisting of several arms and equipped with traffic signals (APILL). The principle of a signalized intersection is to minimize conflicts, both primary and secondary conflicts. Primary conflicts are conflicts between two intersecting traffic flows, and secondary conflicts are conflicts that occur from opposing straight or turning flows that intersect with straight flows or pedestrians crossing. Queue length is defined as the length of the queue of vehicles queuing along the approach. The average number of vehicle queues at the start of a green light signal (NQ) is calculated as the number of stalled vehicles remaining from the previous green phase (NQ1) plus the number of oncoming vehicles stalled in the queue during the red phase (NQ2). Delay is the additional travel time required to go through the intersection when compared to the path without going through the intersection. From the results of the analysis and calculation of the capacity value on Jalan Trunojoyo 1789.18 skr / hour while on Jalan Teja 52 skr / hour, from the results of the analysis and calculation of the queue length value on Jalan Trunojoyo 4.9 m while on Jalan Teja 3.4 m. The results of the analysis and calculation of the delay value on Jalan Trunojoyo 2.72 seconds / km while on Jalan Teja 24.2 seconds / km, from the results of the analysis and calculation of the degree of saturation value on Jalan Trunojoyo 0.36 while on Jalan Teja 0.36.

Authors

Publication Details

Journal
Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil
Published
2025-09-30
DOI
https://doi.org/10.25139/jprs.v8i2.10087
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Kinerja Simpang Bersinyal Pada Ruas Jalan Trunojoyo Pamekasan (Km. 111 + 300) Dengan Metode PKJI

Dedy Asmaroni, Ahmad Fatoni, Muhammad Zainal Abidin, Moh Dicky Alvian Farosy et al.
Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil
Urban Transport Systems Analysis
article

Analisis Kinerja Simpang Bersinyal Pada Ruas Jalan Trunojoyo Pamekasan (Km. 111 + 300) Dengan Metode PKJI

Dedy Asmaroni, Ahmad Fatoni, Muhammad Zainal Abidin, Moh Dicky Alvian Farosy, Safin Ayatullah Humeni
article en

Abstract

Pamekasan is a district that is currently developing, this is characterized by many large shops such as pizza hut, eiger, minisho, and gacoan noodles. This is because Pamekasan has a strategic location, where Pamekasan is located in the middle of Madura Island. The growth rate of vehicles in Pamekasan city is increasingly uncontrollable. The rapid growth of vehicles each year so that it can not keep up with the increase in road infrastructure, which causes congestion, especially at peak hours that have an impact on travel time and work effectiveness time. A signalized intersection is an intersection consisting of several arms and equipped with traffic signals (APILL). The principle of a signalized intersection is to minimize conflicts, both primary and secondary conflicts. Primary conflicts are conflicts between two intersecting traffic flows, and secondary conflicts are conflicts that occur from opposing straight or turning flows that intersect with straight flows or pedestrians crossing. Queue length is defined as the length of the queue of vehicles queuing along the approach. The average number of vehicle queues at the start of a green light signal (NQ) is calculated as the number of stalled vehicles remaining from the previous green phase (NQ1) plus the number of oncoming vehicles stalled in the queue during the red phase (NQ2). Delay is the additional travel time required to go through the intersection when compared to the path without going through the intersection. From the results of the analysis and calculation of the capacity value on Jalan Trunojoyo 1789.18 skr / hour while on Jalan Teja 52 skr / hour, from the results of the analysis and calculation of the queue length value on Jalan Trunojoyo 4.9 m while on Jalan Teja 3.4 m. The results of the analysis and calculation of the delay value on Jalan Trunojoyo 2.72 seconds / km while on Jalan Teja 24.2 seconds / km, from the results of the analysis and calculation of the degree of saturation value on Jalan Trunojoyo 0.36 while on Jalan Teja 0.36.

Ge-STRAM Jurnal Perencanaan dan Rekayasa SipilVol. 8(2)
Openalex Percentile: Top 72%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.