Mass-housing projects (MHPs) are often delivered using mass construction to save time and cost. However, it actually leads to large work in progress (WIP), delays, and cost overrun. Moreover, to finance mass construction works, housing developers often sell off-plan large number of housing units leading to financial losses especially during economic downturns. Accordingly, this research evaluates the effectiveness of adopting the lean concept "One-Piece Flow (OPF)" for delivering MHPs instead of mass construction. OPF-based construction relies on batch production which helps reduce WIP, production cycle time, and rework. A comparative analysis, using an actual case study, was conducted between mass construction and OPF-based construction in terms of performance and economic worthiness. Moreover, despite completing the project in more time and cost, the results showed that the OPF-based construction delivery achieved, on average, 43% higher profitability and reduced time waste by an average of 47% per building. Thus, this research confirms the potential of adopting OPF-based construction for MHPs.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-09-30
DOI
https://doi.org/10.1038/s41598-025-19779-w
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigating the application of one piece flow from lean manufacturing in the construction delivery of mass housing projects

Dina A. Saad, Md. Ahsan Habib, A.A. Abou-Zeid
Scientific Reports
BIM and Construction Integration
article

Investigating the application of one piece flow from lean manufacturing in the construction delivery of mass housing projects

Dina A. Saad, Md. Ahsan Habib, A.A. Abou-Zeid
article en

Abstract

Mass-housing projects (MHPs) are often delivered using mass construction to save time and cost. However, it actually leads to large work in progress (WIP), delays, and cost overrun. Moreover, to finance mass construction works, housing developers often sell off-plan large number of housing units leading to financial losses especially during economic downturns. Accordingly, this research evaluates the effectiveness of adopting the lean concept "One-Piece Flow (OPF)" for delivering MHPs instead of mass construction. OPF-based construction relies on batch production which helps reduce WIP, production cycle time, and rework. A comparative analysis, using an actual case study, was conducted between mass construction and OPF-based construction in terms of performance and economic worthiness. Moreover, despite completing the project in more time and cost, the results showed that the OPF-based construction delivery achieved, on average, 43% higher profitability and reduced time waste by an average of 47% per building. Thus, this research confirms the potential of adopting OPF-based construction for MHPs.

Scientific ReportsVol. 15(1)
Cairo University (EG)
Science and Technology Development Fund
Openalex Percentile: Top 71%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Investigating the application of one piece flow from lean manufacturing in the construction delivery of mass housing projects — Dina A. Saad, Md. Ahsan Habib, et al. · Scientific Reports (2025) | TGRS Research Map | TGRS