Optimization of Construction Resource Management in Civil Pipeline Engineering Based on MOPSO Algorithm

With the acceleration of urbanization, the construction resource management of civil pipeline engineering construction needs to seek a balance between multiple objectives such as resource allocation. In response to this challenge, a construction resource management optimization model based on an improved multi-objective particle swarm optimization algorithm is proposed to improve the efficiency and quality of construction resource management. The new model integrates the explosion mechanism and dual archive mechanism of the fireworks algorithm to improve the efficiency and quality of the solution. To enhance the generalizability of the model across diverse civil pipeline engineering scenarios, synthetic data were employed for pre-training. This approach addresses the challenge of limited real-world data variability by simulating various construction conditions, such as varying geological environments, resource supply fluctuations, and task complexity gradients. The experiment outcomes indicate that the improved multi-objective particle swarm optimization algorithm has a stable solution time and CPU usage of 2.28 seconds and 28.29% at 100 iterations, which is better than the 3.01 seconds and 42.67% of the multi-role and multi-strategy improved particle swarm algorithm. In practical applications, the new model reduces the total cost of pipeline engineering from 176000 dollars to 157211 dollars, a decrease of 10.68%, and shortens the shortest construction period from 255 days to 230 days, a reduction of 10.20%. The pipeline is buried underground for one year without any damage, and the construction quality is guaranteed. This study presents an effective optimization approach for construction resource management in civil pipeline engineering projects, firmly situated within the realm of urban infrastructure development. By implementing this approach, it not only contributes to a reduction in construction costs and an enhancement in engineering quality, but also pioneers a novel research avenue for multi-objective optimization across diverse types of engineering management scenarios. It can be implemented and applied in future research topics.

Authors

Institutions

Publication Details

Journal
IEEE Access
Published
2025-01-01
DOI
https://doi.org/10.1109/access.2025.3616184
Primary Topic
E-commerce and Technology Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Construction Resource Management in Civil Pipeline Engineering Based on MOPSO Algorithm

Yunpeng Zhang
IEEE Access
E-commerce and Technology Innovations
article

Optimization of Construction Resource Management in Civil Pipeline Engineering Based on MOPSO Algorithm

Yunpeng Zhang
article en

Abstract

With the acceleration of urbanization, the construction resource management of civil pipeline engineering construction needs to seek a balance between multiple objectives such as resource allocation. In response to this challenge, a construction resource management optimization model based on an improved multi-objective particle swarm optimization algorithm is proposed to improve the efficiency and quality of construction resource management. The new model integrates the explosion mechanism and dual archive mechanism of the fireworks algorithm to improve the efficiency and quality of the solution. To enhance the generalizability of the model across diverse civil pipeline engineering scenarios, synthetic data were employed for pre-training. This approach addresses the challenge of limited real-world data variability by simulating various construction conditions, such as varying geological environments, resource supply fluctuations, and task complexity gradients. The experiment outcomes indicate that the improved multi-objective particle swarm optimization algorithm has a stable solution time and CPU usage of 2.28 seconds and 28.29% at 100 iterations, which is better than the 3.01 seconds and 42.67% of the multi-role and multi-strategy improved particle swarm algorithm. In practical applications, the new model reduces the total cost of pipeline engineering from 176000 dollars to 157211 dollars, a decrease of 10.68%, and shortens the shortest construction period from 255 days to 230 days, a reduction of 10.20%. The pipeline is buried underground for one year without any damage, and the construction quality is guaranteed. This study presents an effective optimization approach for construction resource management in civil pipeline engineering projects, firmly situated within the realm of urban infrastructure development. By implementing this approach, it not only contributes to a reduction in construction costs and an enhancement in engineering quality, but also pioneers a novel research avenue for multi-objective optimization across diverse types of engineering management scenarios. It can be implemented and applied in future research topics.

IEEE Access
Rongcheng City People's Hospital (CN)
Openalex Percentile: Top 49%
E-commerce and Technology Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of Construction Resource Management in Civil Pipeline Engineering Based on MOPSO Algorithm — Yunpeng Zhang · IEEE Access (2025) | TGRS Research Map | TGRS