An Exact Solution Algorithm to Solve the No-Wait Flow Shop Scheduling Problem with Earliness and Tardiness Objectives

The no-wait flow shop scheduling problem (NWFSP) is an extension of the traditional flow shop configuration, where jobs follow a fixed sequence of machines. The NWFSP extends the flow shop problem by incorporating a constraint that does not allow jobs to wait between subsequent machines. Recent studies on the NWFSP have primarily focused on traditional objectives, such as makespan, total flow time, and total completion time. However, there are limited studies addressing the simultaneous use of earliness and tardiness objectives. Classified as NP-hard, the NWFSP poses significant computational challenges when seeking optimal solutions for large problem instances. To overcome this, heuristic and metaheuristic algorithms, including simulated annealing, tabu search, and particle swarm algorithm, are commonly used to find near-optimal solutions. Nevertheless, exact solution methods for this problem remain scarce in existing literature. To fill this gap, this paper introduces a novel mixed-integer programming (MIP) model for the NWFSP and presents a branch-and-cut (BC) algorithm built upon this new model, with the objective of minimizing earliness and tardiness. The BC algorithm is combined with a heuristic approach to provide strong upper bounds. It systematically explores the problem space and improves mathematical formulations using cutting plane techniques. The algorithm’s performance is tested using a comprehensive set of benchmark problem instances, with results compared to a MIP model from the literature. Computational experiments demonstrate that the proposed BC algorithm is effective both in terms of solution quality and computational efficiency.

Authors

Institutions

Publication Details

Journal
Deu Muhendislik Fakultesi Fen ve Muhendislik
Published
2025-09-29
DOI
https://doi.org/10.21205/deufmd.2025278117
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Exact Solution Algorithm to Solve the No-Wait Flow Shop Scheduling Problem with Earliness and Tardiness Objectives

Alper Hamzadayı
Deu Muhendislik Fakultesi Fen ve Muhendislik
Scheduling and Optimization Algorithms
article

An Exact Solution Algorithm to Solve the No-Wait Flow Shop Scheduling Problem with Earliness and Tardiness Objectives

Alper Hamzadayı
article en

Abstract

The no-wait flow shop scheduling problem (NWFSP) is an extension of the traditional flow shop configuration, where jobs follow a fixed sequence of machines. The NWFSP extends the flow shop problem by incorporating a constraint that does not allow jobs to wait between subsequent machines. Recent studies on the NWFSP have primarily focused on traditional objectives, such as makespan, total flow time, and total completion time. However, there are limited studies addressing the simultaneous use of earliness and tardiness objectives. Classified as NP-hard, the NWFSP poses significant computational challenges when seeking optimal solutions for large problem instances. To overcome this, heuristic and metaheuristic algorithms, including simulated annealing, tabu search, and particle swarm algorithm, are commonly used to find near-optimal solutions. Nevertheless, exact solution methods for this problem remain scarce in existing literature. To fill this gap, this paper introduces a novel mixed-integer programming (MIP) model for the NWFSP and presents a branch-and-cut (BC) algorithm built upon this new model, with the objective of minimizing earliness and tardiness. The BC algorithm is combined with a heuristic approach to provide strong upper bounds. It systematically explores the problem space and improves mathematical formulations using cutting plane techniques. The algorithm’s performance is tested using a comprehensive set of benchmark problem instances, with results compared to a MIP model from the literature. Computational experiments demonstrate that the proposed BC algorithm is effective both in terms of solution quality and computational efficiency.

Deu Muhendislik Fakultesi Fen ve MuhendislikVol. 27(81)
Van Yüzüncü Yıl Üniversitesi (TR)
Openalex Percentile: Top 62%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.