Comparative Life Cycle Cost Analysis of Trenchless and Traditional Sewerage Rehabilitation Methods: A Case Study of Tanga Urban Water Supply and Sanitation Authority, Tanzania

The sewerage infrastructure in Tanga City, managed by the Tanga Urban Water Supply and Sanitation Authority (TANGA UWASA), faces significant challenges due to ageing pipes, coastal corrosion, and urbanisation pressures, leading to frequent failures and environmental risks. This study conducts a Life Cycle Cost Analysis (LCCA) to compare trenchless technologies (TT), specifically Cured in Place Pipe (CIPP), with traditional open-cut methods for rehabilitating a 1 km, 225 mm diameter sewer line over a 50-year lifespan. Utilising primary data from TANGA UWASA, contractor estimates, and stakeholder surveys, the analysis employs Net Present Value (NPV) modelling. Results indicate that CIPP offers 48.2% cost savings (TZS 4.67 billion vs. TZS 9.01 billion) compared to open-cut methods, driven by reduced maintenance costs (TZS 110 million/year vs. TZS 275 million/year), less frequent rehabilitation (every 25 years vs. every 10 years), and lower indirect costs (TZS 600 million vs. TZS 2,100 million). Environmentally, CIPP reduces excavated material by 95% (60 m³ vs. 1,200 m³) and contamination risks by 82%. Socially, it mitigates traffic disruptions by 78% and business losses by 70%, yielding TZS 510 million in benefits. Key barriers include reactive maintenance practices (72% of activities), lack of expertise (70% of contractors are untrained), and financial constraints. Recommendations include a TT pilot on Street No. 10/Makoko Road, capacity-building partnerships, and policy incentives aligned with Tanzania’s National Water Policy (NAWAPO, 2025). This study provides a robust framework for TANGA UWASA to adopt cost-effective, sustainable sewerage rehabilitation, enhancing urban resilience and public health.

Authors

Institutions

Publication Details

Journal
East African Journal of Engineering
Published
2025-09-12
DOI
https://doi.org/10.37284/eaje.8.1.3636
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparative Life Cycle Cost Analysis of Trenchless and Traditional Sewerage Rehabilitation Methods: A Case Study of Tanga Urban Water Supply and Sanitation Authority, Tanzania

David Gibson, Ramadhani Abdul
East African Journal of Engineering
Infrastructure Maintenance and Monitoring
article

Comparative Life Cycle Cost Analysis of Trenchless and Traditional Sewerage Rehabilitation Methods: A Case Study of Tanga Urban Water Supply and Sanitation Authority, Tanzania

David Gibson, Ramadhani Abdul
article en

Abstract

The sewerage infrastructure in Tanga City, managed by the Tanga Urban Water Supply and Sanitation Authority (TANGA UWASA), faces significant challenges due to ageing pipes, coastal corrosion, and urbanisation pressures, leading to frequent failures and environmental risks. This study conducts a Life Cycle Cost Analysis (LCCA) to compare trenchless technologies (TT), specifically Cured in Place Pipe (CIPP), with traditional open-cut methods for rehabilitating a 1 km, 225 mm diameter sewer line over a 50-year lifespan. Utilising primary data from TANGA UWASA, contractor estimates, and stakeholder surveys, the analysis employs Net Present Value (NPV) modelling. Results indicate that CIPP offers 48.2% cost savings (TZS 4.67 billion vs. TZS 9.01 billion) compared to open-cut methods, driven by reduced maintenance costs (TZS 110 million/year vs. TZS 275 million/year), less frequent rehabilitation (every 25 years vs. every 10 years), and lower indirect costs (TZS 600 million vs. TZS 2,100 million). Environmentally, CIPP reduces excavated material by 95% (60 m³ vs. 1,200 m³) and contamination risks by 82%. Socially, it mitigates traffic disruptions by 78% and business losses by 70%, yielding TZS 510 million in benefits. Key barriers include reactive maintenance practices (72% of activities), lack of expertise (70% of contractors are untrained), and financial constraints. Recommendations include a TT pilot on Street No. 10/Makoko Road, capacity-building partnerships, and policy incentives aligned with Tanzania’s National Water Policy (NAWAPO, 2025). This study provides a robust framework for TANGA UWASA to adopt cost-effective, sustainable sewerage rehabilitation, enhancing urban resilience and public health.

East African Journal of EngineeringVol. 8(1)
Dar es Salaam Institute of Technology (TZ)
Openalex Percentile: Top 72%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.