Factors influencing design productivity in Denmark: implications for enhanced design management

An increase in design complexity, participants, and technologies, has heightened the focus on general productivity and design productivity within the architectural, engineering and construction (AEC) industry. However, measuring design productivity through traditional means has proven insufficient. To know more about what constitutes high-design productivity, 25 factors, affecting design productivity, were identified and ranked based on survey answers from 80 respondents working with architecture and engineering in Denmark. The statistical analysis revealed a close ranking of a multitude of the 25 factors, with factors contained in the management factor category being significantly more important than labour and technical factors ranking 2 and 3, while project factors ranked 4, and the external factors ranked 5. However, to manage design productivity efficiently, this study showed that focusing on only management factors is not enough, and that various interrelationships are detectable between the 25 factors quantitatively and qualitatively. This study adds to the existing body of knowledge by focusing on the underlying factors affecting design productivity, providing guidance for project managers on where to focus to manage and improve design productivity.

Authors

Institutions

Publication Details

Journal
Architectural Engineering and Design Management
Published
2025-09-29
DOI
https://doi.org/10.1080/17452007.2025.2561754
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors influencing design productivity in Denmark: implications for enhanced design management

Simon Wyke, Søren Munch Lindhard, Kjeld Svidt, Маргарита Георгиева et al.
2 citations
Architectural Engineering and Design Management
Construction Project Management and Performance
4.21
article

Factors influencing design productivity in Denmark: implications for enhanced design management

Simon Wyke, Søren Munch Lindhard, Kjeld Svidt, Маргарита Георгиева, Kameliya Mincheva
article en
2 citations

Abstract

An increase in design complexity, participants, and technologies, has heightened the focus on general productivity and design productivity within the architectural, engineering and construction (AEC) industry. However, measuring design productivity through traditional means has proven insufficient. To know more about what constitutes high-design productivity, 25 factors, affecting design productivity, were identified and ranked based on survey answers from 80 respondents working with architecture and engineering in Denmark. The statistical analysis revealed a close ranking of a multitude of the 25 factors, with factors contained in the management factor category being significantly more important than labour and technical factors ranking 2 and 3, while project factors ranked 4, and the external factors ranked 5. However, to manage design productivity efficiently, this study showed that focusing on only management factors is not enough, and that various interrelationships are detectable between the 25 factors quantitatively and qualitatively. This study adds to the existing body of knowledge by focusing on the underlying factors affecting design productivity, providing guidance for project managers on where to focus to manage and improve design productivity.

Architectural Engineering and Design Management
Aalborg University (DK)
Openalex Percentile: Top 5%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Factors influencing design productivity in Denmark: implications for enhanced design management — Simon Wyke, Søren Munch Lindhard, et al. · Architectural Engineering and Design Management (2025) | TGRS Research Map | TGRS