A Rolling Horizon Approach to Solve the Simultaneous Lot Sizing and Scheduling Problem

This paper proposes a method for production planning and control at the operational level, addressing the simultaneous lot-sizing and scheduling problem. It introduces a mixed-integer programming (MIP) formulation and a three-phase solution method for the multi-level generalized lot-sizing and scheduling problem in a multi-machine, multi-level, and multi-period setting. The model accounts for sequence-dependent setups, setup carry-over, and production capacity constraints, while not allowing backlogs. Although the proposed solution method is not yet scalable for solving large real-world instances involving the weekly demand for thousands of finished products, the algorithm demonstrates significant improvements over commercial solvers and remains practical for optimizing production planning in smaller instances, such as the bottleneck section of a production system.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.174
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Rolling Horizon Approach to Solve the Simultaneous Lot Sizing and Scheduling Problem

Silvia Proietti, Vittorio Cesarotti, Mirco Lecce, Matteo Rosi et al.
IFAC-PapersOnLine
Advanced Manufacturing and Logistics Optimization
article

A Rolling Horizon Approach to Solve the Simultaneous Lot Sizing and Scheduling Problem

Silvia Proietti, Vittorio Cesarotti, Mirco Lecce, Matteo Rosi, Emanuele Fiocco
article en

Abstract

This paper proposes a method for production planning and control at the operational level, addressing the simultaneous lot-sizing and scheduling problem. It introduces a mixed-integer programming (MIP) formulation and a three-phase solution method for the multi-level generalized lot-sizing and scheduling problem in a multi-machine, multi-level, and multi-period setting. The model accounts for sequence-dependent setups, setup carry-over, and production capacity constraints, while not allowing backlogs. Although the proposed solution method is not yet scalable for solving large real-world instances involving the weekly demand for thousands of finished products, the algorithm demonstrates significant improvements over commercial solvers and remains practical for optimizing production planning in smaller instances, such as the bottleneck section of a production system.

IFAC-PapersOnLineVol. 59(10)
University of Rome Tor Vergata (IT)
Openalex Percentile: Top 63%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Rolling Horizon Approach to Solve the Simultaneous Lot Sizing and Scheduling Problem — Silvia Proietti, Vittorio Cesarotti, et al. · IFAC-PapersOnLine (2025) | TGRS Research Map | TGRS