A planning tool for line balancing, sequence planning and employee deployment in high flexible mixed-model assembly lines to prefabricate modular living units – a case study

To effectively address customization needs in building production is of importance to receive contracts in off-site construction, which consequently means that the number of variants to be handled in prefabrication lines increase. New approaches in off-site construction aim to better cover the need of customization by increasing the flexibility of mixed-model assembly lines for module production. However, this potentially increased flexibility in the prefabrication plans needs to be appropriately considered in various planning tasks at the tactical and operational level. Consequently, this paper addresses the balancing of high flexible mixed-model assembly lines, the sequence planning of modules, the employee deployment planning and material requirement planning. An algorithm for a planning tool was developed and tested to support these tasks to provide suitable plans for operations managers, giving them the ability to manage and control the productivity of high flexible mixed model assembly lines. The test results revealed the generation of suitable solutions from a line balancing and sequence planning perspective but showed the need for further research to enable the application of outcomes from employee deployment planning not just at the tactical but also at the operational level. Cycle times calculated for available projects show a line efficiency of up to 70% and propose worker station and task reallocation in order to improve worker’s utilization and the number of specific workers needed. This research consequently contributes to enable a higher level of customization of products off-site construction but at the same time facilitating a high level of productivity and efficiency of module prefabrication lines.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.009
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A planning tool for line balancing, sequence planning and employee deployment in high flexible mixed-model assembly lines to prefabricate modular living units – a case study

Manfred Gronalt, Wolfgang Grenzfurtner, Tobias Weberhofer
IFAC-PapersOnLine
Assembly Line Balancing Optimization
article

A planning tool for line balancing, sequence planning and employee deployment in high flexible mixed-model assembly lines to prefabricate modular living units – a case study

Manfred Gronalt, Wolfgang Grenzfurtner, Tobias Weberhofer
article en

Abstract

To effectively address customization needs in building production is of importance to receive contracts in off-site construction, which consequently means that the number of variants to be handled in prefabrication lines increase. New approaches in off-site construction aim to better cover the need of customization by increasing the flexibility of mixed-model assembly lines for module production. However, this potentially increased flexibility in the prefabrication plans needs to be appropriately considered in various planning tasks at the tactical and operational level. Consequently, this paper addresses the balancing of high flexible mixed-model assembly lines, the sequence planning of modules, the employee deployment planning and material requirement planning. An algorithm for a planning tool was developed and tested to support these tasks to provide suitable plans for operations managers, giving them the ability to manage and control the productivity of high flexible mixed model assembly lines. The test results revealed the generation of suitable solutions from a line balancing and sequence planning perspective but showed the need for further research to enable the application of outcomes from employee deployment planning not just at the tactical but also at the operational level. Cycle times calculated for available projects show a line efficiency of up to 70% and propose worker station and task reallocation in order to improve worker’s utilization and the number of specific workers needed. This research consequently contributes to enable a higher level of customization of products off-site construction but at the same time facilitating a high level of productivity and efficiency of module prefabrication lines.

IFAC-PapersOnLineVol. 59(10)
University of Bayreuth (DE), BOKU University (AT)
Openalex Percentile: Top 63%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A planning tool for line balancing, sequence planning and employee deployment in high flexible mixed-model assembly lines to prefabricate modular living units – a case study — Manfred Gronalt, Wolfgang Grenzfurtner, et al. · IFAC-PapersOnLine (2025) | TGRS Research Map | TGRS