A combined optimization and simulation model approach to enhance mixed model assembly line balancing in prefabricated house industry

The construction industry is shifting towards off-site construction for improved labor conditions, better quality and less environmental impact. The prefabrication of timber framed houses contains of several unique wall-elements, which are assembled on one or more assembly lines and then put together on site. To stay competitive with the conventional construction industry the processes need to be improved. The aim of this study is to generate new improved task configurations for the assembly line and test them for real-life application. This is done by developing a mixed model assembly line balancing algorithm for prefabricated houses to create the configurations. Subsequently, these configurations are implemented in a validated discrete event simulation model to test for real-life feasibility and compare the results based on four indicators, cycle time per station, waiting time per station, time in system per wall-element and produced wall-elements, with the current production plant. The results show that the optimized task configurations generate more balanced cycle times, less waiting times and a time in system improvement for each wall element of around 20%. However, due to the complex and varying properties of the wall elements queuing effects can be observed with discrete event simulation and the outcome compared with the real-life production can only be improved by 1,8%. This research approach demonstrates the significant potential that the combination of optimization and simulation offers to operations managers in mixed-model planning within prefabricated housebuilding. However, it also reveals the necessity for an integrated procedure of assembly line balancing and sequencing to fully utilize these possibilities.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.008
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A combined optimization and simulation model approach to enhance mixed model assembly line balancing in prefabricated house industry

Manfred Gronalt, Maria Anna Gartner, Wolfgang Grenzfurtner, Tobias Weberhofer
IFAC-PapersOnLine
Assembly Line Balancing Optimization
article

A combined optimization and simulation model approach to enhance mixed model assembly line balancing in prefabricated house industry

Manfred Gronalt, Maria Anna Gartner, Wolfgang Grenzfurtner, Tobias Weberhofer
article en

Abstract

The construction industry is shifting towards off-site construction for improved labor conditions, better quality and less environmental impact. The prefabrication of timber framed houses contains of several unique wall-elements, which are assembled on one or more assembly lines and then put together on site. To stay competitive with the conventional construction industry the processes need to be improved. The aim of this study is to generate new improved task configurations for the assembly line and test them for real-life application. This is done by developing a mixed model assembly line balancing algorithm for prefabricated houses to create the configurations. Subsequently, these configurations are implemented in a validated discrete event simulation model to test for real-life feasibility and compare the results based on four indicators, cycle time per station, waiting time per station, time in system per wall-element and produced wall-elements, with the current production plant. The results show that the optimized task configurations generate more balanced cycle times, less waiting times and a time in system improvement for each wall element of around 20%. However, due to the complex and varying properties of the wall elements queuing effects can be observed with discrete event simulation and the outcome compared with the real-life production can only be improved by 1,8%. This research approach demonstrates the significant potential that the combination of optimization and simulation offers to operations managers in mixed-model planning within prefabricated housebuilding. However, it also reveals the necessity for an integrated procedure of assembly line balancing and sequencing to fully utilize these possibilities.

IFAC-PapersOnLineVol. 59(10)
University of Bayreuth (DE), BOKU University (AT)
Openalex Percentile: Top 63%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.