Integrating Production and Preventive Maintenance in the Flexible Job Shop Scheduling Problem with Setup Times and Sequence-Dependent.

Nowadays, process automation and the requirement for simultaneous decision making in supply chain processes have driven the evolution of production planning and scheduling models. One of the problems best known for its complexity and real-industry use is the Flexible Job Shop Problem. The difficulty of planning preventive maintenance and fitting it in the production schedule in the optimal way requires the creation of mathematical models capable of describing the problem and solving it. Machine setup times make the problem more realistic, given that setup times are in fact different from the time taken by the machines to process the jobs. In this paper, an Integer Linear Programming model is presented to describe the problem and solve short instances while a Variable Neighborhood Descent algorithm is used to solve large instances. To test the performance of this model, some instances are created using random numbers. The results showed that the mathematical model finds the optimal solution for the majority of the instances and the results of the large instances are reported to be used as references for future work.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.128
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating Production and Preventive Maintenance in the Flexible Job Shop Scheduling Problem with Setup Times and Sequence-Dependent.

William Torres-Tapia, Andrés Alberto García-León
IFAC-PapersOnLine
Scheduling and Optimization Algorithms
article

Integrating Production and Preventive Maintenance in the Flexible Job Shop Scheduling Problem with Setup Times and Sequence-Dependent.

William Torres-Tapia, Andrés Alberto García-León
article en

Abstract

Nowadays, process automation and the requirement for simultaneous decision making in supply chain processes have driven the evolution of production planning and scheduling models. One of the problems best known for its complexity and real-industry use is the Flexible Job Shop Problem. The difficulty of planning preventive maintenance and fitting it in the production schedule in the optimal way requires the creation of mathematical models capable of describing the problem and solving it. Machine setup times make the problem more realistic, given that setup times are in fact different from the time taken by the machines to process the jobs. In this paper, an Integer Linear Programming model is presented to describe the problem and solve short instances while a Variable Neighborhood Descent algorithm is used to solve large instances. To test the performance of this model, some instances are created using random numbers. The results showed that the mathematical model finds the optimal solution for the majority of the instances and the results of the large instances are reported to be used as references for future work.

IFAC-PapersOnLineVol. 59(10)
Universidad del Norte (CO), Tecnológico de Monterrey (MX)
Openalex Percentile: Top 63%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.