Closing the loop in the Assembly Line Balancing Problem: the operator’s point of view on the repetition of similar tasks

In an assembly line, a product passes through different stations, undergoing every task of the precedence graph that describes its assembly process, until it reaches the state of a finished product. Modeling the occupational (ergonomic) and mental workload of assigned tasks requires careful control of task sequencing at each station. From the operators’ point of view, the task sequence repeats with period equal to the cycle time. The operator that is assigned to a station performs only a subset of the total tasks, repeating it in a loop on every product that flows in the line. We present a new model that accurately considers these loops, integrating pauses between physically or mentally demanding tasks, or inserting alternative tasks as a way to rest. The result is a tool that places the human at the center of the production systems, in line with Industry 5.0 indications and mitigating the risks of workforce shortages.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.133
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Closing the loop in the Assembly Line Balancing Problem: the operator’s point of view on the repetition of similar tasks

Michele Martignago
IFAC-PapersOnLine
Assembly Line Balancing Optimization
article

Closing the loop in the Assembly Line Balancing Problem: the operator’s point of view on the repetition of similar tasks

Michele Martignago
article en

Abstract

In an assembly line, a product passes through different stations, undergoing every task of the precedence graph that describes its assembly process, until it reaches the state of a finished product. Modeling the occupational (ergonomic) and mental workload of assigned tasks requires careful control of task sequencing at each station. From the operators’ point of view, the task sequence repeats with period equal to the cycle time. The operator that is assigned to a station performs only a subset of the total tasks, repeating it in a loop on every product that flows in the line. We present a new model that accurately considers these loops, integrating pauses between physically or mentally demanding tasks, or inserting alternative tasks as a way to rest. The result is a tool that places the human at the center of the production systems, in line with Industry 5.0 indications and mitigating the risks of workforce shortages.

IFAC-PapersOnLineVol. 59(10)
University of Padua (IT)
Openalex Percentile: Top 63%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Closing the loop in the Assembly Line Balancing Problem: the operator’s point of view on the repetition of similar tasks — Michele Martignago · IFAC-PapersOnLine (2025) | TGRS Research Map | TGRS