Multi-objective disassembly line optimization with collaborative robots

Disassembly is a crucial phase in remanufacturing and recycling, gaining increasing attention over the past decades due to its importance in sustainable resource management. While various decision-making challenges within the disassembly process have been studied, we focus on two closely related problems: the disassembly sequencing problem and the disassembly line balancing problem, specifically in the context of human-robot collaboration. We consider a bi-objective problem of total time-dependent cost minimization and workload balancing between activated workstations. The goal is to identify the best disassembly task sequence and the optimal assignment of tasks to operators and workstations in order to meet the problem’s objectives. To overcome these challenges, we formulate the problem as a mixed integer program and compare the ϵ-constraint and weighted sum methods to generate Pareto fronts. Computational experiments conducted on real-world end-of-life product structures validate the proposed model’s efficiency on small and medium-scale structures.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.010
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective disassembly line optimization with collaborative robots

Faicel Hnaien, Zied Jemaï, Ilhem Slama, Oumayma Laouini
IFAC-PapersOnLine
Manufacturing Process and Optimization
article

Multi-objective disassembly line optimization with collaborative robots

Faicel Hnaien, Zied Jemaï, Ilhem Slama, Oumayma Laouini
article en

Abstract

Disassembly is a crucial phase in remanufacturing and recycling, gaining increasing attention over the past decades due to its importance in sustainable resource management. While various decision-making challenges within the disassembly process have been studied, we focus on two closely related problems: the disassembly sequencing problem and the disassembly line balancing problem, specifically in the context of human-robot collaboration. We consider a bi-objective problem of total time-dependent cost minimization and workload balancing between activated workstations. The goal is to identify the best disassembly task sequence and the optimal assignment of tasks to operators and workstations in order to meet the problem’s objectives. To overcome these challenges, we formulate the problem as a mixed integer program and compare the ϵ-constraint and weighted sum methods to generate Pareto fronts. Computational experiments conducted on real-world end-of-life product structures validate the proposed model’s efficiency on small and medium-scale structures.

IFAC-PapersOnLineVol. 59(10)
Université de Technologie de Troyes (FR), Université Paris-Saclay (FR), CentraleSupélec (FR)
Openalex Percentile: Top 63%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multi-objective disassembly line optimization with collaborative robots — Faicel Hnaien, Zied Jemaï, et al. · IFAC-PapersOnLine (2025) | TGRS Research Map | TGRS