Optimizing total tardiness and resource occupation in a textile sewing shop using a multi-objective heuristic

This study addresses a dual resource constrained flexible job shop scheduling problem occurring in a textile sewing shop with multi-purpose machines and multi-skilled operators. Sequence-dependent setup times may occur for both operators and machines. Two objectives are considered, namely the total tardiness and the resource occupation. A heuristic exploiting the earliest starting time and the estimated tardiness of jobs is proposed to address this problem. A mixed-integer linear programming model aiming at minimizing the total tardiness is used as a benchmark. A detailed computational analysis is carried out on a set of industrial instances. The performance of the heuristic is evaluated on both criteria. Results highlight the relevance of the heuristic in obtaining solutions that balance total tardiness and resource utilization, demonstrating its applicability to real-world scenarios.

Authors

Institutions

Publication Details

Journal
IFAC-PapersOnLine
Published
2025-01-01
DOI
https://doi.org/10.1016/j.ifacol.2025.09.224
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing total tardiness and resource occupation in a textile sewing shop using a multi-objective heuristic

Taha Arbaoui, Tom Perroux, Leïla Merghem‐Boulahia, Khaled Hadj-Hamou et al.
IFAC-PapersOnLine
Scheduling and Optimization Algorithms
article

Optimizing total tardiness and resource occupation in a textile sewing shop using a multi-objective heuristic

Taha Arbaoui, Tom Perroux, Leïla Merghem‐Boulahia, Khaled Hadj-Hamou, Jean-Dominique Regazzoni
article en

Abstract

This study addresses a dual resource constrained flexible job shop scheduling problem occurring in a textile sewing shop with multi-purpose machines and multi-skilled operators. Sequence-dependent setup times may occur for both operators and machines. Two objectives are considered, namely the total tardiness and the resource occupation. A heuristic exploiting the earliest starting time and the estimated tardiness of jobs is proposed to address this problem. A mixed-integer linear programming model aiming at minimizing the total tardiness is used as a benchmark. A detailed computational analysis is carried out on a set of industrial instances. The performance of the heuristic is evaluated on both criteria. Results highlight the relevance of the heuristic in obtaining solutions that balance total tardiness and resource utilization, demonstrating its applicability to real-world scenarios.

IFAC-PapersOnLineVol. 59(10)
Université Claude Bernard Lyon 1 (FR), Université de Technologie de Troyes (FR), Université Lumière Lyon 2 (FR), Vinci (France) (FR), Centre Hospitalier de Troyes (FR), Decision & Information Sciences for Production Systems (FR), Institut National des Sciences Appliquées de Lyon (FR), Université Jean Monnet (FR)
Openalex Percentile: Top 63%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimizing total tardiness and resource occupation in a textile sewing shop using a multi-objective heuristic — Taha Arbaoui, Tom Perroux, et al. · IFAC-PapersOnLine (2025) | TGRS Research Map | TGRS