Analysis of Production Cost Calculation Using the Full Costing Method to Determine Prices Production Mainstays in Tempe Business

The purpose of this study is to determine and analyze the price main production Tempe Berkah Wasis Susanto per unit if calculated using the method full costing and difference price main production Tempe Berkah Wasis Susanto used so far with the full costing method. This type of research is a case study with the object of research Tempe Berkah Wasis Susanto business. Data collection was carried out through in-depth interviews and direct observation. Data analysis used qualitative descriptive analysis. The results of the study showed that the cost of production of Tempe Berkah Wasis Susanto per unit when calculated using the full costing method was Rp7,050 higher than the calculation results made by the business actor of Rp6,400. The cost of production using the full costing method was Rp47,516,250 higher than the calculation results used by the business actor of Rp43,050,000 with a difference of Rp4,466,250. The cost of production per unit using the full costing method was Rp7,050 higher than the calculation results made by the business actor of Rp6,400 with a difference of Rp650.

Authors

Publication Details

Journal
Digital Innovation
Published
2025-09-26
DOI
https://doi.org/10.61132/digitalinnovation.v2i4.538
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Production Cost Calculation Using the Full Costing Method to Determine Prices Production Mainstays in Tempe Business

Anisa Sains Kharisma, Mohamad Badrun Zaman, Dwi Harini, Nasiruddin Nasiruddin et al.
Digital Innovation
Manufacturing Process and Optimization
article

Analysis of Production Cost Calculation Using the Full Costing Method to Determine Prices Production Mainstays in Tempe Business

Anisa Sains Kharisma, Mohamad Badrun Zaman, Dwi Harini, Nasiruddin Nasiruddin, Ziad Imadulbilad
article en

Abstract

The purpose of this study is to determine and analyze the price main production Tempe Berkah Wasis Susanto per unit if calculated using the method full costing and difference price main production Tempe Berkah Wasis Susanto used so far with the full costing method. This type of research is a case study with the object of research Tempe Berkah Wasis Susanto business. Data collection was carried out through in-depth interviews and direct observation. Data analysis used qualitative descriptive analysis. The results of the study showed that the cost of production of Tempe Berkah Wasis Susanto per unit when calculated using the full costing method was Rp7,050 higher than the calculation results made by the business actor of Rp6,400. The cost of production using the full costing method was Rp47,516,250 higher than the calculation results used by the business actor of Rp43,050,000 with a difference of Rp4,466,250. The cost of production per unit using the full costing method was Rp7,050 higher than the calculation results made by the business actor of Rp6,400 with a difference of Rp650.

Digital InnovationVol. 2(4)
Openalex Percentile: Top 63%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.