Design and Build Project Scheduling Applications Using the Critical Path Method

Effective project planning and scheduling is a crucial factor in ensuring the successful implementation of projects, especially in the construction sector. CV Kayfa Permata, a construction company, often faces challenges in managing project time and resources optimally. To overcome these challenges, this study aims to design and build a desktop/web-based project scheduling application that implements the Critical Path Method (CPM) method. The uniqueness of this application lies in its ability to automatically calculate critical paths, total project duration, as well as visualize work network diagrams, which are directly tailored to the operational needs of the local company. Different from a theoretical or simulation approach, this research produces an applicative solution that can be implemented directly in a real work environment. The application development methodology uses a waterfall approach, with stages of needs analysis, system design, implementation, and testing. The test results show that the app is able to improve the efficiency of project scheduling and simplify the decision-making process. With this application, it is hoped that the project scheduling process at CV Kayfa Permata will be more systematic, efficient, and measurable.

Authors

Institutions

Publication Details

Journal
Bigint Computing Journal
Published
2025-08-09
DOI
https://doi.org/10.55537/bigint.v3i2.1255
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and Build Project Scheduling Applications Using the Critical Path Method

Muhammad Raihan, Abdul Syahputra Sidabalok
1 citations
Bigint Computing Journal
BIM and Construction Integration
1.01
article

Design and Build Project Scheduling Applications Using the Critical Path Method

Muhammad Raihan, Abdul Syahputra Sidabalok
article en
1 citations

Abstract

Effective project planning and scheduling is a crucial factor in ensuring the successful implementation of projects, especially in the construction sector. CV Kayfa Permata, a construction company, often faces challenges in managing project time and resources optimally. To overcome these challenges, this study aims to design and build a desktop/web-based project scheduling application that implements the Critical Path Method (CPM) method. The uniqueness of this application lies in its ability to automatically calculate critical paths, total project duration, as well as visualize work network diagrams, which are directly tailored to the operational needs of the local company. Different from a theoretical or simulation approach, this research produces an applicative solution that can be implemented directly in a real work environment. The application development methodology uses a waterfall approach, with stages of needs analysis, system design, implementation, and testing. The test results show that the app is able to improve the efficiency of project scheduling and simplify the decision-making process. With this application, it is hoped that the project scheduling process at CV Kayfa Permata will be more systematic, efficient, and measurable.

Bigint Computing JournalVol. 3(2)
Universitas Islam Negeri Sumatera Utara (ID)
Openalex Percentile: Top 20%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Design and Build Project Scheduling Applications Using the Critical Path Method — Muhammad Raihan, Abdul Syahputra Sidabalok · Bigint Computing Journal (2025) | TGRS Research Map | TGRS