PDCA for Team Performance Management in Lean-IPD

Team performance is critical to the success of Integrated Project Delivery (IPD) projects, yet existing IPD contracts and guidelines offer limited direction on monitoring and managing it.While Lean Construction tools can support collaboration and project delivery, their effectiveness is not guaranteed without a structured implementation approach.This study explores the team performance management approach used during the Detailed Design phase of a Lean-IPD case project through the lens of the Plan-Do-Check-Act (PDCA) cycle, a suitable framework for structuring team performance management practices around continuous improvement.Drawing on the case study results, the research highlights the consequences of insufficient integration between performance monitoring (Check phase) and responsive adjustments (Act phase), where the bi-weekly Percent Plan Complete (PPC) for design tasks fell to just 23%.The results also emphasize the need to monitor broader dimensions of team performance, such as coordination, communication, and collaboration, rather than relying solely on workflow metrics like PPC, in order to support a more holistic understanding of team dynamics.The findings underscore the importance of having a systematic approach to team performance management and offer insights to guide the development of a structured PDCAbased framework for team performance management in Lean-IPD environments.

Authors

Publication Details

Journal
Annual Conference of the International Group for Lean Construction
Published
2025-06-02
DOI
https://doi.org/10.24928/2025/0276
Primary Topic
Flexible and Reconfigurable Manufacturing Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PDCA for Team Performance Management in Lean-IPD

Puyan A. Zadeh, Sheryl Staub‐French, Fatima Alsakka, Devarsh Bhonde
Annual Conference of the International Group for Lean Construction
Flexible and Reconfigurable Manufacturing Systems
article

PDCA for Team Performance Management in Lean-IPD

Puyan A. Zadeh, Sheryl Staub‐French, Fatima Alsakka, Devarsh Bhonde
article en

Abstract

Team performance is critical to the success of Integrated Project Delivery (IPD) projects, yet existing IPD contracts and guidelines offer limited direction on monitoring and managing it.While Lean Construction tools can support collaboration and project delivery, their effectiveness is not guaranteed without a structured implementation approach.This study explores the team performance management approach used during the Detailed Design phase of a Lean-IPD case project through the lens of the Plan-Do-Check-Act (PDCA) cycle, a suitable framework for structuring team performance management practices around continuous improvement.Drawing on the case study results, the research highlights the consequences of insufficient integration between performance monitoring (Check phase) and responsive adjustments (Act phase), where the bi-weekly Percent Plan Complete (PPC) for design tasks fell to just 23%.The results also emphasize the need to monitor broader dimensions of team performance, such as coordination, communication, and collaboration, rather than relying solely on workflow metrics like PPC, in order to support a more holistic understanding of team dynamics.The findings underscore the importance of having a systematic approach to team performance management and offer insights to guide the development of a structured PDCAbased framework for team performance management in Lean-IPD environments.

Annual Conference of the International Group for Lean Construction
Openalex Percentile: Top 42%
Flexible and Reconfigurable Manufacturing Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PDCA for Team Performance Management in Lean-IPD — Puyan A. Zadeh, Sheryl Staub‐French, et al. · Annual Conference of the International Group for Lean Construction (2025) | TGRS Research Map | TGRS