More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Abstract Expanding United States electricity infrastructure to meet growing demand could require extensive power plant development footprints and land use conversion, depending on the mix of generation types chosen. Understanding where future power plant sitings are likely to take place and identifying potential conflicts and land-use tradeoffs will be key to identifying feasible and affordable investments and evaluating regional planning coordination needs. Here we use an integrated modeling framework that combines capacity expansion planning, hourly grid operations, and geospatial techno-economic analysis to develop projections (2025-2050) of power plant sitings in the Western United States (US) at a 1 km 2 resolution for a business-as-usual scenario and a high renewables penetration scenario. We find that 30% more land will be needed in the high renewables scenario as compared to business-as-usual, and that 75% of that development is projected to be located within 10 km of natural areas.

Authors

Institutions

Publication Details

Journal
Communications Earth & Environment
Published
2025-09-26
DOI
https://doi.org/10.1038/s43247-025-02632-3
Citations
3
Primary Topic
Photovoltaic Systems and Sustainability
Type
article
Field-Weighted Citation Impact
2.40

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Cameron Bracken, Casey Burleyson, Konstantinos Oikonomou, Jennie S. Rice et al.
3 citations
Communications Earth & Environment
Photovoltaic Systems and Sustainability
2.40
article

More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Cameron Bracken, Casey Burleyson, Konstantinos Oikonomou, Jennie S. Rice, Kendall Mongird, Travis Thurber, Yang Ou, Nathalie Voisin
article en
3 citations

Abstract

Abstract Expanding United States electricity infrastructure to meet growing demand could require extensive power plant development footprints and land use conversion, depending on the mix of generation types chosen. Understanding where future power plant sitings are likely to take place and identifying potential conflicts and land-use tradeoffs will be key to identifying feasible and affordable investments and evaluating regional planning coordination needs. Here we use an integrated modeling framework that combines capacity expansion planning, hourly grid operations, and geospatial techno-economic analysis to develop projections (2025-2050) of power plant sitings in the Western United States (US) at a 1 km 2 resolution for a business-as-usual scenario and a high renewables penetration scenario. We find that 30% more land will be needed in the high renewables scenario as compared to business-as-usual, and that 75% of that development is projected to be located within 10 km of natural areas.

Communications Earth & EnvironmentVol. 6(1)
Pacific Northwest National Laboratory (US)
U.S. Department of Energy, Battelle, Pacific Northwest National Laboratory
Openalex Percentile: Top 11%
Photovoltaic Systems and Sustainability
2.40
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.