Simulation of Takt Time Planning Study Case: Housing in the New Capital City of Indonesia

The housing development project in Indonesia's Nusantara Capital City (IKN) deals with various challenges, including high complexity and uncertainty, limited resources, and logistical issues.Effective construction management strategies are therefore required for accomplishing the project on time.Takt Time Planning is a method in Lean Construction used to adjust the workflow and to create an efficient process for complex projects.This study aims to simulate Takt Time Planning on a finished project focusing on the alignment between planned takt time and actual performance.We employ a systematic quantitative approach by integrating takt time analysis with the Line of Balance method, utilizing project documents, and field documentation.Our findings suggest that subsequent adjustments lead to improved efficiency and earlier project completion while initial planning encounters balancing issues.We highlight that Takt Time Planning should be followed up with control mechanism to reach takt time consistency.

Authors

Publication Details

Journal
Annual Conference of the International Group for Lean Construction
Published
2025-06-02
DOI
https://doi.org/10.24928/2025/0148
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation of Takt Time Planning Study Case: Housing in the New Capital City of Indonesia

Aditya Rio Prabowo, Rina Asri Aisyah, Abdhy Gazali, Prama Putra et al.
Annual Conference of the International Group for Lean Construction
BIM and Construction Integration
article

Simulation of Takt Time Planning Study Case: Housing in the New Capital City of Indonesia

Aditya Rio Prabowo, Rina Asri Aisyah, Abdhy Gazali, Prama Putra, Galang Bastiono, Helen Libastari
article en

Abstract

The housing development project in Indonesia's Nusantara Capital City (IKN) deals with various challenges, including high complexity and uncertainty, limited resources, and logistical issues.Effective construction management strategies are therefore required for accomplishing the project on time.Takt Time Planning is a method in Lean Construction used to adjust the workflow and to create an efficient process for complex projects.This study aims to simulate Takt Time Planning on a finished project focusing on the alignment between planned takt time and actual performance.We employ a systematic quantitative approach by integrating takt time analysis with the Line of Balance method, utilizing project documents, and field documentation.Our findings suggest that subsequent adjustments lead to improved efficiency and earlier project completion while initial planning encounters balancing issues.We highlight that Takt Time Planning should be followed up with control mechanism to reach takt time consistency.

Annual Conference of the International Group for Lean Construction
Openalex Percentile: Top 74%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Simulation of Takt Time Planning Study Case: Housing in the New Capital City of Indonesia — Aditya Rio Prabowo, Rina Asri Aisyah, et al. · Annual Conference of the International Group for Lean Construction (2025) | TGRS Research Map | TGRS