Application of BIM technology in the architectural design phase

As construction projects grow increasingly complex and large-scale, traditional 2D design methods are no longer sufficient to meet the requirements of modern architectural design. To address this issue, a method is proposed to enhance design efficiency, construction quality, and project outcomes by analyzing the practical application of BIM in Hohhot Production Scheduling and Command Center project. The application of BIM technology in this project demonstrates its effectiveness in improving design quality and efficiency, while also highlighting its potential in promoting green building, energy conservation, and environmental protection. By leveraging BIM’s energy simulation, material optimization, and sustainable design analysis capabilities, this approach has significantly reduced energy consumption and material waste, thereby minimizing environmental impact throughout the construction lifecycle. The successful application of BIM technology in Hohhot Production Scheduling and Command Center project demonstrates the effectiveness of the method and provides insights and references for the technology's future industry application.

Authors

Institutions

Publication Details

Published
2025-09-25
DOI
https://doi.org/10.1117/12.3078723
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of BIM technology in the architectural design phase

Tiejun Jiang, Yurong Shi, Yang Liu, Kun Liu
BIM and Construction Integration
article

Application of BIM technology in the architectural design phase

Tiejun Jiang, Yurong Shi, Yang Liu, Kun Liu
article en

Abstract

As construction projects grow increasingly complex and large-scale, traditional 2D design methods are no longer sufficient to meet the requirements of modern architectural design. To address this issue, a method is proposed to enhance design efficiency, construction quality, and project outcomes by analyzing the practical application of BIM in Hohhot Production Scheduling and Command Center project. The application of BIM technology in this project demonstrates its effectiveness in improving design quality and efficiency, while also highlighting its potential in promoting green building, energy conservation, and environmental protection. By leveraging BIM’s energy simulation, material optimization, and sustainable design analysis capabilities, this approach has significantly reduced energy consumption and material waste, thereby minimizing environmental impact throughout the construction lifecycle. The successful application of BIM technology in Hohhot Production Scheduling and Command Center project demonstrates the effectiveness of the method and provides insights and references for the technology's future industry application.

Harbin Institute of Technology (CN), Inner Mongolia Electric Power (China) (CN)
Openalex Percentile: Top 72%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.