Assessing the Readiness for Building Information Modelling (BIM) Implementation Using the Technology Readiness Index: A Case Study of the Patimban Port Project in West Java, Indonesia

This research examines the digital transformation challenges in Indonesia’s infrastructure development through a case study of BIM implementation at Patimban Port, West Java. Employing the Technology Readiness Index (TRI) framework, the study measures stakeholder preparedness across four psychological dimensions: (1) optimism toward benefits, (2) willingness to innovate, (3) technical discomfort, and (4) data security concerns. Primary data were gathered through two approaches: (1) a TRI-based questionnaire administered to 47 professionals, and (2) semi-structured interviews with key stakeholders to explore underlying challenges, revealing a paradoxical pattern: while 68% of respondents acknowledged BIM’s strategic value (mean optimism score=2.75), 72% reported implementation hesitancy due to technical skill deficiencies (discomfort score=2.40). The findings offer practical insights for overcoming technology adoption barriers in large-scale infrastructure projects within developing country contexts, particularly addressing the competency gap through targeted training programs.

Authors

Institutions

Publication Details

Journal
Interdiciplinary Journal and Hummanity (INJURITY)
Published
2025-09-23
DOI
https://doi.org/10.58631/injurity.v4i9.1480
Primary Topic
Technology Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing the Readiness for Building Information Modelling (BIM) Implementation Using the Technology Readiness Index: A Case Study of the Patimban Port Project in West Java, Indonesia

Novi Sudiansyah, Donny Mugia Prayoga
Interdiciplinary Journal and Hummanity (INJURITY)
Technology Assessment and Management
article

Assessing the Readiness for Building Information Modelling (BIM) Implementation Using the Technology Readiness Index: A Case Study of the Patimban Port Project in West Java, Indonesia

Novi Sudiansyah, Donny Mugia Prayoga
article en

Abstract

This research examines the digital transformation challenges in Indonesia’s infrastructure development through a case study of BIM implementation at Patimban Port, West Java. Employing the Technology Readiness Index (TRI) framework, the study measures stakeholder preparedness across four psychological dimensions: (1) optimism toward benefits, (2) willingness to innovate, (3) technical discomfort, and (4) data security concerns. Primary data were gathered through two approaches: (1) a TRI-based questionnaire administered to 47 professionals, and (2) semi-structured interviews with key stakeholders to explore underlying challenges, revealing a paradoxical pattern: while 68% of respondents acknowledged BIM’s strategic value (mean optimism score=2.75), 72% reported implementation hesitancy due to technical skill deficiencies (discomfort score=2.40). The findings offer practical insights for overcoming technology adoption barriers in large-scale infrastructure projects within developing country contexts, particularly addressing the competency gap through targeted training programs.

Interdiciplinary Journal and Hummanity (INJURITY)Vol. 4(9)
Universitas Swadaya Gunung Jati (ID)
Openalex Percentile: Top 68%
Technology Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.