Pelaksanaan Quality Control yang Efektif sebagai Salah Satu Upaya untuk Mencapai Target Produksi pada Perusahaan CV.Weenee Anugerah Tekstil di Kota Malang

The aim of this research is to determine the effect of implementating Quality Coontrol on production effectiveness to achieve production targets at the company Cv.Weenee Anugerah Textile. The method ised this research is descriptive method with a quantitative approach. The research technique used for data collection was field research,while data analysis used a cause and effect diagram (fishbone chart).in this research,the results obtained show that the company has implemented quality control. If a company wants to impelement zero defects,it can use six sigma. Now the compny is currently still at level 4 sigma with a value 2993 DPMO,because to achieve six sigma need to reach a value of 3.4 DPMO.

Authors

Institutions

Publication Details

Journal
Ebisnis Manajemen
Published
2024-08-14
DOI
https://doi.org/10.59603/ebisman.v2i3.502
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pelaksanaan Quality Control yang Efektif sebagai Salah Satu Upaya untuk Mencapai Target Produksi pada Perusahaan CV.Weenee Anugerah Tekstil di Kota Malang

Cintia Anggraini, Wahju Wuladari, Mulyono Mulyono
Ebisnis Manajemen
Management and Optimization Techniques
article

Pelaksanaan Quality Control yang Efektif sebagai Salah Satu Upaya untuk Mencapai Target Produksi pada Perusahaan CV.Weenee Anugerah Tekstil di Kota Malang

Cintia Anggraini, Wahju Wuladari, Mulyono Mulyono
article en

Abstract

The aim of this research is to determine the effect of implementating Quality Coontrol on production effectiveness to achieve production targets at the company Cv.Weenee Anugerah Textile. The method ised this research is descriptive method with a quantitative approach. The research technique used for data collection was field research,while data analysis used a cause and effect diagram (fishbone chart).in this research,the results obtained show that the company has implemented quality control. If a company wants to impelement zero defects,it can use six sigma. Now the compny is currently still at level 4 sigma with a value 2993 DPMO,because to achieve six sigma need to reach a value of 3.4 DPMO.

Ebisnis ManajemenVol. 2(3)
Universitas Widya Gama Malang (ID)
Openalex Percentile: Top 46%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.