Optimization of Construction Scheduling using Dynamic Programming

Complicated construction initiatives that take place in dynamic contexts require that many ambiguities be taken into consideration at the planning phase. Instruments for managing recurrent initiatives that take into consideration the ambiguities present in the construction context are severely lacking. This study aims to introduce a technique for the optimal scheduling of recurring construction initiatives in the face of ambiguity. The fuzzy set concept is used in the study to simulate the uncertainty related to various input variables. Specifically designed to receive input for various factors, carry out the required calculations, and effectively produce output in terms of fuzzy values, it uses a dynamic programming technique. The issue is described as a dynamic programming framework with two phases. A comparison between the suggested strategy and the traditional and expanded key chain administration methodologies was made to assess the system's effectiveness. The standard data test model studies and an actual construction initiative scenario are used for the verification. The suggested approach was validated through the presentation of cases and statistics. In the real scenario, the outcomes show how effective the suggested multi-objective temporal buffers strategy is. According to the findings, the suggested strong buffer sizing strategy produces a more durable strategy than the conventional approaches.

Authors

Institutions

Publication Details

Published
2025-08-04
DOI
https://doi.org/10.1109/icscsa66339.2025.11171170
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Construction Scheduling using Dynamic Programming

B. C. Joshi, Sangeeta Singh, Kimsy Gulhane, Akanksha Chauhan et al.
BIM and Construction Integration
article

Optimization of Construction Scheduling using Dynamic Programming

B. C. Joshi, Sangeeta Singh, Kimsy Gulhane, Akanksha Chauhan, Anorgul Ashirova
article en

Abstract

Complicated construction initiatives that take place in dynamic contexts require that many ambiguities be taken into consideration at the planning phase. Instruments for managing recurrent initiatives that take into consideration the ambiguities present in the construction context are severely lacking. This study aims to introduce a technique for the optimal scheduling of recurring construction initiatives in the face of ambiguity. The fuzzy set concept is used in the study to simulate the uncertainty related to various input variables. Specifically designed to receive input for various factors, carry out the required calculations, and effectively produce output in terms of fuzzy values, it uses a dynamic programming technique. The issue is described as a dynamic programming framework with two phases. A comparison between the suggested strategy and the traditional and expanded key chain administration methodologies was made to assess the system's effectiveness. The standard data test model studies and an actual construction initiative scenario are used for the verification. The suggested approach was validated through the presentation of cases and statistics. In the real scenario, the outcomes show how effective the suggested multi-objective temporal buffers strategy is. According to the findings, the suggested strong buffer sizing strategy produces a more durable strategy than the conventional approaches.

Oil and Natural Gas Corporation (India) (IN), Noida International University (IN), Dehradun Institute of Technology University (IN)
Openalex Percentile: Top 72%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of Construction Scheduling using Dynamic Programming — B. C. Joshi, Sangeeta Singh, et al. · (2025) | TGRS Research Map | TGRS