Analysis of Kaizen Projects in an Assembly Line and Warehouse of an Electric Motor Manufacturing Company

The objective of the present work is to analyze the case of Kaizen projects carried out in an assembly line and warehouse of a company dedicated to the manufacture of electric motors. The projects lasted 9 weeks and its main purpose was the generation of improvement proposals to achieve greater productivity in the organization. The Kaizen methodology was followed to analyze the current state, lean tools were used to improve the work areas, supermarkets of raw materials and components were established through a real, critical and systematic analysis of the production line. Significant benefits were generated for the organization, such as reduction in material delivery times in points of use from 90 minutes to 40 minutes, reduction of delivery distances traveled from 864 mts to 209 mts, reduction loss for shafts handling from 2055 USD per month to none, 100% efficiency accomplish with customer request, improvement of 5´S metrics from 2.25 to 4.15, important reduction of downtime and waste. From this experience it is concluded that the methodology employed had great impact in the organization.

Authors

Publication Details

Published
2025-06-17
DOI
https://doi.org/10.46254/na10.20250133
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Kaizen Projects in an Assembly Line and Warehouse of an Electric Motor Manufacturing Company

María de los Ángeles Martínez-Mercado, Elva Patricia Puente-Aguilar, Nury Margarita Leal-Rendón, Patricia Gómez-Fuentes
Assembly Line Balancing Optimization
article

Analysis of Kaizen Projects in an Assembly Line and Warehouse of an Electric Motor Manufacturing Company

María de los Ángeles Martínez-Mercado, Elva Patricia Puente-Aguilar, Nury Margarita Leal-Rendón, Patricia Gómez-Fuentes
article en

Abstract

The objective of the present work is to analyze the case of Kaizen projects carried out in an assembly line and warehouse of a company dedicated to the manufacture of electric motors. The projects lasted 9 weeks and its main purpose was the generation of improvement proposals to achieve greater productivity in the organization. The Kaizen methodology was followed to analyze the current state, lean tools were used to improve the work areas, supermarkets of raw materials and components were established through a real, critical and systematic analysis of the production line. Significant benefits were generated for the organization, such as reduction in material delivery times in points of use from 90 minutes to 40 minutes, reduction of delivery distances traveled from 864 mts to 209 mts, reduction loss for shafts handling from 2055 USD per month to none, 100% efficiency accomplish with customer request, improvement of 5´S metrics from 2.25 to 4.15, important reduction of downtime and waste. From this experience it is concluded that the methodology employed had great impact in the organization.

Openalex Percentile: Top 63%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Kaizen Projects in an Assembly Line and Warehouse of an Electric Motor Manufacturing Company — María de los Ángeles Martínez-Mercado, Elva Patricia Puente-Aguilar, et al. · (2025) | TGRS Research Map | TGRS