Geological and hydrogeological risk assessment for tunnel excavation in water-bearing tuff zones: a case study

When a fault fracture zone composed of tuff occurs within a tunnel construction site, the surrounding rock mass becomes highly unstable, significantly increasing the risk of geological hazards. To detect the location of such fracture zones ahead of tunnel excavation and to take timely preventive measures, this study develops a comprehensive geological forecasting system. Based on the No. 5 Tunnel of the Yinchuo-Jiliao Project, a comprehensive geological forecasting system combining geological analysis, seismic wave method, and polarization excitation method was utilized to conduct advanced prediction of the location of the fractured zone and groundwater development ahead of the tunnel face. Additionally, a treatment plan for the fractured zone in the unexcavated sections was formulated based on the results of the advanced geological forecasting. This approach effectively prevented geological hazards during construction, ensuring the safe and efficient operation of the Tunnel Boring Machine (TBM) within the tuff fault zone. The research results provide practical guidance for the prevention and mitigation of geological disasters in similar geological settings.

Authors

Institutions

Publication Details

Published
2025-09-25
DOI
https://doi.org/10.1117/12.3076350
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Geological and hydrogeological risk assessment for tunnel excavation in water-bearing tuff zones: a case study

Zhicheng Song, Hailei Zhao, Yongsheng Liu, Bo Wang et al.
Tunneling and Rock Mechanics
article

Geological and hydrogeological risk assessment for tunnel excavation in water-bearing tuff zones: a case study

Zhicheng Song, Hailei Zhao, Yongsheng Liu, Bo Wang, Shilei Zhang, Zhenxing Yang, Pengyu Jing
article en

Abstract

When a fault fracture zone composed of tuff occurs within a tunnel construction site, the surrounding rock mass becomes highly unstable, significantly increasing the risk of geological hazards. To detect the location of such fracture zones ahead of tunnel excavation and to take timely preventive measures, this study develops a comprehensive geological forecasting system. Based on the No. 5 Tunnel of the Yinchuo-Jiliao Project, a comprehensive geological forecasting system combining geological analysis, seismic wave method, and polarization excitation method was utilized to conduct advanced prediction of the location of the fractured zone and groundwater development ahead of the tunnel face. Additionally, a treatment plan for the fractured zone in the unexcavated sections was formulated based on the results of the advanced geological forecasting. This approach effectively prevented geological hazards during construction, ensuring the safe and efficient operation of the Tunnel Boring Machine (TBM) within the tuff fault zone. The research results provide practical guidance for the prevention and mitigation of geological disasters in similar geological settings.

Shandong University (CN), Inner Mongolia Electric Power (China) (CN), Guizhou Electric Power Design and Research Institute (CN), China Power Engineering Consulting Group (China) (CN), Intelligent Machines (Sweden) (SE)
Openalex Percentile: Top 73%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.