Railway Transport Sustainability and Challenges in Sub-Saharan Africa: The Case of Cameroon

A sustainable and reliable railway transport system is quite pertinent in instigating production and distribution of goods and services especially in far-off enclave areas. However, the operation of this transport sector in Cameroon is yet to come to its prime. It is bogged down by a wide range of challenges which cuts across delays, poor infrastructure, and accidents occurrences linked to poor management which sometimes results from the use of old-fashioned and worn-out engines/wagons. This is in sharp contrast with other developing countries who uses Metro and TVG (Train à Grande Vitesse). This study was therefore designed to investigate into these challenges and point out key areas to ameliorate. Methodology used involved secondary and primary sourced data. Secondary data was germane from published and unpublished sources such as the Cameroon National Railway Mater Plan, Camrail website, related articles amidst others. Primary data was gotten from field studies where observations and interviews were conducted to draw insights about the Cameroon railway sector in view of the sustainability and challenges. The processed data revealed that, in terms of management, delays and late arrivals of trains based on time schedules was common. More so, frequent occurrences of accident results from poor management (overloading) the case of Eseka on October 21, 2016, along the Yaoundé-Douala railway line. Apart from overloading and accidents, infrastructure is poor especially railway tracks which lacks sufficient maintenance. More so, it was observed that, rail infrastructure since 1999 when Camrail began its operation under Boloré African Logistics, infrastructure have been a deteriorating base on observations and comparison before Camrail emerged. This study, however, strongly recommends, increase investments in Cameroon railway lines through upgrading of infrastructure, and most importantly the introduction of electric trains such as TVG and Metro which are efficient and swift to meet the needs of increasing population and to meet agenda 2035.

Authors

Publication Details

Journal
Saudi Journal of Humanities and Social Sciences
Published
2025-09-20
DOI
https://doi.org/10.36348/sjhss.2025.v10i09.001
Primary Topic
Transport and Economic Policies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Railway Transport Sustainability and Challenges in Sub-Saharan Africa: The Case of Cameroon

Tufoin Kilian Diang, Tende Renz Tchafogwe
Saudi Journal of Humanities and Social Sciences
Transport and Economic Policies
article

Railway Transport Sustainability and Challenges in Sub-Saharan Africa: The Case of Cameroon

Tufoin Kilian Diang, Tende Renz Tchafogwe
article en

Abstract

A sustainable and reliable railway transport system is quite pertinent in instigating production and distribution of goods and services especially in far-off enclave areas. However, the operation of this transport sector in Cameroon is yet to come to its prime. It is bogged down by a wide range of challenges which cuts across delays, poor infrastructure, and accidents occurrences linked to poor management which sometimes results from the use of old-fashioned and worn-out engines/wagons. This is in sharp contrast with other developing countries who uses Metro and TVG (Train à Grande Vitesse). This study was therefore designed to investigate into these challenges and point out key areas to ameliorate. Methodology used involved secondary and primary sourced data. Secondary data was germane from published and unpublished sources such as the Cameroon National Railway Mater Plan, Camrail website, related articles amidst others. Primary data was gotten from field studies where observations and interviews were conducted to draw insights about the Cameroon railway sector in view of the sustainability and challenges. The processed data revealed that, in terms of management, delays and late arrivals of trains based on time schedules was common. More so, frequent occurrences of accident results from poor management (overloading) the case of Eseka on October 21, 2016, along the Yaoundé-Douala railway line. Apart from overloading and accidents, infrastructure is poor especially railway tracks which lacks sufficient maintenance. More so, it was observed that, rail infrastructure since 1999 when Camrail began its operation under Boloré African Logistics, infrastructure have been a deteriorating base on observations and comparison before Camrail emerged. This study, however, strongly recommends, increase investments in Cameroon railway lines through upgrading of infrastructure, and most importantly the introduction of electric trains such as TVG and Metro which are efficient and swift to meet the needs of increasing population and to meet agenda 2035.

Saudi Journal of Humanities and Social SciencesVol. 10(09)
Openalex Percentile: Top 62%
Transport and Economic Policies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.