Manajemen Risiko Pada Skema Kpbu Preservasi Jalan Nasional Lintas Timur Sumatera Di Provinsi Sumatera Selatan

The Indonesian government has accelerated infrastructure development as reflected in the RPJMN 2015-2019 and one of them is road infrastructure, namely Lintas Timur Sumatera National Road in South Sumatra Province (Jalintim Sumsel). Existing condition data shows that Jalintim Sumsel needs to do road preservation. There is a gap between the availability of government funds (APBN) and infrastructure needs listed in the RPJMN 2015-2019, financing for road preservation at Jalintim Sumsel can be carried out using other financing alternatives, namely the Public Private Partnership (PPP) scheme with availability payment. In the PPP scheme, it is necessary to carry out risk management so that risks that are difficult to fulfill can be estimated how to mitigate them, one of which is by risk allocation. The research objective is to find out what risks occur in the project, the dominant risk prediction, and the dominant risk allocation. The scope of risk management is carried out on two perceptions of the parties involved in the project, namely BUP and PJPK with a long list of risks and probability (P) and impact (I) assessment questionnaire, and also risk cost assessment through interviews. The results of the analysis show that there are 63 risks faced by the PJPK and 60 risks faced by the BUP, there are 7 dominant risks according to the PJPK's perception and 4 dominant risks according to the BUP's perception. The results of risk allocation show that for the Risk of Increase in Construction Costs, Poor Contractor/Subcontractor Performance, Increase in O&M Costs (overloading), Inflation Rate, and Interest Rate are more allocated to BUP. As for the Risk of Failure to Pay AP on Time allocated to PJPK, as well as for Politics Force Majeure Risk and Prolonged Force Majeure are allocated jointly.

Authors

Institutions

Publication Details

Journal
Cerdika Jurnal Ilmiah Indonesia
Published
2025-09-24
DOI
https://doi.org/10.59141/cerdika.v5i9.2839
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Manajemen Risiko Pada Skema Kpbu Preservasi Jalan Nasional Lintas Timur Sumatera Di Provinsi Sumatera Selatan

Balqis Fataya Said, Iris Mahani, Eliza Rosmaya Puri, Rani Gayatri K. P.
Cerdika Jurnal Ilmiah Indonesia
Urban Transport Systems Analysis
article

Manajemen Risiko Pada Skema Kpbu Preservasi Jalan Nasional Lintas Timur Sumatera Di Provinsi Sumatera Selatan

Balqis Fataya Said, Iris Mahani, Eliza Rosmaya Puri, Rani Gayatri K. P.
article en

Abstract

The Indonesian government has accelerated infrastructure development as reflected in the RPJMN 2015-2019 and one of them is road infrastructure, namely Lintas Timur Sumatera National Road in South Sumatra Province (Jalintim Sumsel). Existing condition data shows that Jalintim Sumsel needs to do road preservation. There is a gap between the availability of government funds (APBN) and infrastructure needs listed in the RPJMN 2015-2019, financing for road preservation at Jalintim Sumsel can be carried out using other financing alternatives, namely the Public Private Partnership (PPP) scheme with availability payment. In the PPP scheme, it is necessary to carry out risk management so that risks that are difficult to fulfill can be estimated how to mitigate them, one of which is by risk allocation. The research objective is to find out what risks occur in the project, the dominant risk prediction, and the dominant risk allocation. The scope of risk management is carried out on two perceptions of the parties involved in the project, namely BUP and PJPK with a long list of risks and probability (P) and impact (I) assessment questionnaire, and also risk cost assessment through interviews. The results of the analysis show that there are 63 risks faced by the PJPK and 60 risks faced by the BUP, there are 7 dominant risks according to the PJPK's perception and 4 dominant risks according to the BUP's perception. The results of risk allocation show that for the Risk of Increase in Construction Costs, Poor Contractor/Subcontractor Performance, Increase in O&M Costs (overloading), Inflation Rate, and Interest Rate are more allocated to BUP. As for the Risk of Failure to Pay AP on Time allocated to PJPK, as well as for Politics Force Majeure Risk and Prolonged Force Majeure are allocated jointly.

Cerdika Jurnal Ilmiah IndonesiaVol. 5(9)
Sriwijaya University (ID)
Openalex Percentile: Top 73%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Manajemen Risiko Pada Skema Kpbu Preservasi Jalan Nasional Lintas Timur Sumatera Di Provinsi Sumatera Selatan — Balqis Fataya Said, Iris Mahani, et al. · Cerdika Jurnal Ilmiah Indonesia (2025) | TGRS Research Map | TGRS