Enabling circular construction: barriers to zero waste in the Ghanaian construction industry

Purpose The construction industry is subject to criticism due to its substantial utilization of resources and generation of waste. The concepts of circular economy (CE) and zero waste (ZW) present viable and sustainable solutions; however, achieving significant waste reduction remains a challenge. This paper investigates the barriers hindering the attainment of ZW production in the construction industry in Ghana. Design/methodology/approach A comprehensive literature review was conducted, followed by expert assessment, to identify 24 potential barriers to ZW. A survey questionnaire was then used to solicit the views of construction professionals on the barriers to ZW production in the Ghanaian construction industry. Utilizing exploratory factor analysis, the responses were categorized into four barriers: infrastructure and technology, regulation and awareness, management and planning and operational and implementation barriers. The identified barriers were objectively ranked and prioritized through the application of a fuzzy synthetic evaluation. Findings The findings reveal that the main barriers impacting ZW production are those associated with infrastructure and technology, regulation and awareness, management and planning and operational and implementation issues. The results emphasize the importance of implementing a comprehensive approach that includes advancements in technology, more stringent regulations, increased awareness, strategic planning and improved operations to facilitate the shift toward ZW production. Originality/value Barriers to integrating CE principles and attaining ZW in the Ghanaian construction sector are presented to assist key stakeholders and policymakers in addressing these challenges while also achieving ZW.

Authors

Institutions

Publication Details

Journal
International Journal of Building Pathology and Adaptation
Published
2025-09-23
DOI
https://doi.org/10.1108/ijbpa-02-2025-0038
Citations
1
Primary Topic
Recycled Aggregate Concrete Performance
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enabling circular construction: barriers to zero waste in the Ghanaian construction industry

Prince Antwi-Afari, Amma Kyewaa Agyekum, Joshua Nsiah Addo Ofori, Malik Mansoor Ali Khalfan et al.
1 citations
International Journal of Building Pathology and Adaptation
Recycled Aggregate Concrete Performance
1.01
article

Enabling circular construction: barriers to zero waste in the Ghanaian construction industry

Prince Antwi-Afari, Amma Kyewaa Agyekum, Joshua Nsiah Addo Ofori, Malik Mansoor Ali Khalfan, Benjamin Botchway
article en
1 citations

Abstract

Purpose The construction industry is subject to criticism due to its substantial utilization of resources and generation of waste. The concepts of circular economy (CE) and zero waste (ZW) present viable and sustainable solutions; however, achieving significant waste reduction remains a challenge. This paper investigates the barriers hindering the attainment of ZW production in the construction industry in Ghana. Design/methodology/approach A comprehensive literature review was conducted, followed by expert assessment, to identify 24 potential barriers to ZW. A survey questionnaire was then used to solicit the views of construction professionals on the barriers to ZW production in the Ghanaian construction industry. Utilizing exploratory factor analysis, the responses were categorized into four barriers: infrastructure and technology, regulation and awareness, management and planning and operational and implementation barriers. The identified barriers were objectively ranked and prioritized through the application of a fuzzy synthetic evaluation. Findings The findings reveal that the main barriers impacting ZW production are those associated with infrastructure and technology, regulation and awareness, management and planning and operational and implementation issues. The results emphasize the importance of implementing a comprehensive approach that includes advancements in technology, more stringent regulations, increased awareness, strategic planning and improved operations to facilitate the shift toward ZW production. Originality/value Barriers to integrating CE principles and attaining ZW in the Ghanaian construction sector are presented to assist key stakeholders and policymakers in addressing these challenges while also achieving ZW.

International Journal of Building Pathology and Adaptation
Georgia Institute of Technology (US), Khalifa University of Science and Technology (AE), University of Massachusetts Amherst (US), Kwame Nkrumah University of Science and Technology (GH), Kwame Nkrumah University (ZM), The University of Adelaide (AU)
Openalex Percentile: Top 20%
Recycled Aggregate Concrete Performance
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.