A Fuzzy AHP Model to Examine the Causes of Disputes in the Construction Industry

Disputes pose serious risks for the project participants, and if not appropriately managed, disputes cause significant delays, financial losses, and damage to relationships between the parties. This study aims to systematically identify, analyze, and prioritize the primary causes of disputes by adopting a multicriteria decision-making (MCDM) approach. Expert interviews were conducted to provide in-depth exploration of dispute factors compiled from the literature. The fuzzy analytical hierarchy process (fuzzy AHP) was employed to identify and prioritize the causes of construction disputes. Seven primary factors and their associated subfactors were analyzed and contract-related factors were found as the most significant causes of disputes, with ambiguities in contract documents and incomplete documentation. The study makes a significant contribution to the body of knowledge on construction disputes by developing a systematic and structured framework for understanding and prioritizing the causes of disputes. Beyond its methodological contribution, this research has practical implications for industry professionals, offering a prioritized set of dispute factors that can serve as a decision-making tool for dispute prevention.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2025-09-23
DOI
https://doi.org/10.1061/jladah.ladr-1358
Primary Topic
Multi-Criteria Decision Making
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Fuzzy AHP Model to Examine the Causes of Disputes in the Construction Industry

Pınar Irlayıcı Çakmak
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Multi-Criteria Decision Making
article

A Fuzzy AHP Model to Examine the Causes of Disputes in the Construction Industry

Pınar Irlayıcı Çakmak
article en

Abstract

Disputes pose serious risks for the project participants, and if not appropriately managed, disputes cause significant delays, financial losses, and damage to relationships between the parties. This study aims to systematically identify, analyze, and prioritize the primary causes of disputes by adopting a multicriteria decision-making (MCDM) approach. Expert interviews were conducted to provide in-depth exploration of dispute factors compiled from the literature. The fuzzy analytical hierarchy process (fuzzy AHP) was employed to identify and prioritize the causes of construction disputes. Seven primary factors and their associated subfactors were analyzed and contract-related factors were found as the most significant causes of disputes, with ambiguities in contract documents and incomplete documentation. The study makes a significant contribution to the body of knowledge on construction disputes by developing a systematic and structured framework for understanding and prioritizing the causes of disputes. Beyond its methodological contribution, this research has practical implications for industry professionals, offering a prioritized set of dispute factors that can serve as a decision-making tool for dispute prevention.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(1)
Istanbul Technical University (TR)
Openalex Percentile: Top 70%
Multi-Criteria Decision Making
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.