Manufacturing Task Scheduling Optimization with Buffer Zones using Parallel Advantage Actor-Critic Algorithm

With the diversification of market demands and the limited availability of production resources, optimizing the allocation of manufacturing tasks within the constraints of limited workstation resources becomes increasingly important. This study explores the workstation buffer zone disassembly-assembly line balancing problem, aiming to improve the operational area of workstations and reduce component transportation costs. Based on the characteristics of the problem, a computational model is developed to maximize the recovery profit. To facilitate the search for an optimal solution, the parallel advantage actor-critic (PA2C) algorithm is used to address this problem, and the feasibility of the developed approach in disassembly and assembly lines is analyzed. Comparisons with AC and the original A2C suggest the competitive performance of the proposed solution.

Authors

Institutions

Publication Details

Published
2025-08-17
DOI
https://doi.org/10.1109/case58245.2025.11164104
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Manufacturing Task Scheduling Optimization with Buffer Zones using Parallel Advantage Actor-Critic Algorithm

Bin Hu, Ying Tang, Xiwang Guo, Nan Wang et al.
Scheduling and Optimization Algorithms
article

Manufacturing Task Scheduling Optimization with Buffer Zones using Parallel Advantage Actor-Critic Algorithm

Bin Hu, Ying Tang, Xiwang Guo, Nan Wang, Wenjing Zeng, Weitian Wang, Jiacun Wang
article en

Abstract

With the diversification of market demands and the limited availability of production resources, optimizing the allocation of manufacturing tasks within the constraints of limited workstation resources becomes increasingly important. This study explores the workstation buffer zone disassembly-assembly line balancing problem, aiming to improve the operational area of workstations and reduce component transportation costs. Based on the characteristics of the problem, a computational model is developed to maximize the recovery profit. To facilitate the search for an optimal solution, the parallel advantage actor-critic (PA2C) algorithm is used to address this problem, and the feasibility of the developed approach in disassembly and assembly lines is analyzed. Comparisons with AC and the original A2C suggest the competitive performance of the proposed solution.

William Paterson University (US), Monmouth University (US), Monmouth College (US), Montclair State University (US), Rowan University (US), Kean University (US), New Jersey City University (US)
Openalex Percentile: Top 64%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Manufacturing Task Scheduling Optimization with Buffer Zones using Parallel Advantage Actor-Critic Algorithm — Bin Hu, Ying Tang, et al. · (2025) | TGRS Research Map | TGRS