Determinatives of the conceptual reconsideration of mine planning principles considering market dynamics and the imbalance between ore extraction and waste rock removal

Purpose of the article is to analyze the reasons for the decrease in the efficiency of open-pitdesign due to changes in the mining and metallurgical industry and to justify adaptation measures for dynamic design. The research methodology isbasedonasystematicanalysisofthefunctioningofsuchcomplexandlarge-scalefacilitiesas mining and processing plants and complexes, comparative assessments of the efficiency of their productive activities, as well as causal analysis to determine the root causes of the identified discrepancies and their avoidance. Findings. The main technical and economic indicators of the mining and processing plants of the Kryvyi Rih iron ore basin were considered and analyzed, taking into account dynamic changes, on the basis of which characteristic patterns of trends and fluctuations in the volume of ore and overburden production by plants and individual open-pits were identified; the main reasons that determine them; and also – adjustments to the design concept were proposed, taking into account the temporal factor in its dynamics. The originality. Systemic features and emergence of mining complexes have been identified, which is manifested in the regular alternation of fluctuations in the productivity of open-pits and the dependence of their reaction on internal changes and external factors. On this basis, a new approach to determining the limiting overburden ratio has been proposed and a model for optimizing the production volumes of iron ore products of mining and processing plants has been developed. Practical implementation. The study is devoted to the development of a methodology for determining deviations in overburden operations when changing the productivity of the open-pit for ore and planning mining operations under conditions of fluctuations in demand for iron ore products. The difference of the methodology lies in the ability to quickly adjust the key parameters of the open-pit, taking into account the relationship between the width of the working platform and the length of the active front of the works, which provides a regulatory reserve of ore ready for extraction.

Authors

Publication Details

Journal
Collection of Research Papers of the National Mining University
Published
2025-06-30
DOI
https://doi.org/10.33271/crpnmu/81.037
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determinatives of the conceptual reconsideration of mine planning principles considering market dynamics and the imbalance between ore extraction and waste rock removal

S Lutsenko, Yulian Hryhoriev, S.О. Zhukov, O. A. Kravtsova et al.
Collection of Research Papers of the National Mining University
Mining Techniques and Economics
article

Determinatives of the conceptual reconsideration of mine planning principles considering market dynamics and the imbalance between ore extraction and waste rock removal

S Lutsenko, Yulian Hryhoriev, S.О. Zhukov, O. A. Kravtsova, Aleksey A Kravtsov
article en

Abstract

Purpose of the article is to analyze the reasons for the decrease in the efficiency of open-pitdesign due to changes in the mining and metallurgical industry and to justify adaptation measures for dynamic design. The research methodology isbasedonasystematicanalysisofthefunctioningofsuchcomplexandlarge-scalefacilitiesas mining and processing plants and complexes, comparative assessments of the efficiency of their productive activities, as well as causal analysis to determine the root causes of the identified discrepancies and their avoidance. Findings. The main technical and economic indicators of the mining and processing plants of the Kryvyi Rih iron ore basin were considered and analyzed, taking into account dynamic changes, on the basis of which characteristic patterns of trends and fluctuations in the volume of ore and overburden production by plants and individual open-pits were identified; the main reasons that determine them; and also – adjustments to the design concept were proposed, taking into account the temporal factor in its dynamics. The originality. Systemic features and emergence of mining complexes have been identified, which is manifested in the regular alternation of fluctuations in the productivity of open-pits and the dependence of their reaction on internal changes and external factors. On this basis, a new approach to determining the limiting overburden ratio has been proposed and a model for optimizing the production volumes of iron ore products of mining and processing plants has been developed. Practical implementation. The study is devoted to the development of a methodology for determining deviations in overburden operations when changing the productivity of the open-pit for ore and planning mining operations under conditions of fluctuations in demand for iron ore products. The difference of the methodology lies in the ability to quickly adjust the key parameters of the open-pit, taking into account the relationship between the width of the working platform and the length of the active front of the works, which provides a regulatory reserve of ore ready for extraction.

Collection of Research Papers of the National Mining UniversityVol. 81
Openalex Percentile: Top 68%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.