An Empirical Study of Risk Management Approaches in Information Systems Development Projects from the Vendor's Perspective: Evidence from Japan

Even though the IT outsourcing market continues to grow annually, most risk management research has primarily viewed vendors as a singular type of risk factor, without delving into risk management from the vendors' viewpoint. This study aims to fill this gap and enhance the current, limited empirical research concerning risk management in information systems development (ISD) projects. Our contributions are twofold: First, by unveiling a risk assessment framework from a Japanese vendor company and juxtaposing it against existing literature, we underscore that understanding risk management from the vendor's perspective is paramount; Second, we establish a composite model, integrating both effort and time dimensions, based on regression analyses of 269 ISD projects. From a list of fifty-nine potential risk factors, seven were identified as critical. Notably, the elements of Data Migration Responsibility and Delay Impact on the Customer emerged as significant, demonstrating that the risk intensity of certain factors doesn't always correlate directly with a project's failure rate. Furthermore, our proposed model offers insights into overcoming obstacles that hinder the practical application of risk management research findings.

Authors

Institutions

Publication Details

Published
2025-02-20
DOI
https://doi.org/10.1145/3731806.3731837
Primary Topic
Software Engineering Techniques and Practices
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Empirical Study of Risk Management Approaches in Information Systems Development Projects from the Vendor's Perspective: Evidence from Japan

Akinori Yokota, Kenichi Suzuki, Tingting Huang
Software Engineering Techniques and Practices
article

An Empirical Study of Risk Management Approaches in Information Systems Development Projects from the Vendor's Perspective: Evidence from Japan

Akinori Yokota, Kenichi Suzuki, Tingting Huang
article en

Abstract

Even though the IT outsourcing market continues to grow annually, most risk management research has primarily viewed vendors as a singular type of risk factor, without delving into risk management from the vendors' viewpoint. This study aims to fill this gap and enhance the current, limited empirical research concerning risk management in information systems development (ISD) projects. Our contributions are twofold: First, by unveiling a risk assessment framework from a Japanese vendor company and juxtaposing it against existing literature, we underscore that understanding risk management from the vendor's perspective is paramount; Second, we establish a composite model, integrating both effort and time dimensions, based on regression analyses of 269 ISD projects. From a list of fifty-nine potential risk factors, seven were identified as critical. Notably, the elements of Data Migration Responsibility and Delay Impact on the Customer emerged as significant, demonstrating that the risk intensity of certain factors doesn't always correlate directly with a project's failure rate. Furthermore, our proposed model offers insights into overcoming obstacles that hinder the practical application of risk management research findings.

Mukogawa Women's University (JP), Ritsumeikan University (JP), Tohoku University (JP)
Japan Society for the Promotion of Science
Openalex Percentile: Top 62%
Software Engineering Techniques and Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.