Multi-objective optimization of construction project management based on an improved genetic algorithm

In construction project management, it is crucial to consider multiple objectives, such as duration and cost, to develop an optimal plan. This paper established a multi-objective optimization model, taking into account the construction period, cost, safety, and quality of projects. A genetic algorithm (GA) was selected as the solution method, and the non-dominated sorting genetic algorithm-II (NSGA-II) was optimized by cat mapping, adaptive crossover, and mutation operators to obtain an improved algorithm for the model solution. Experiments were conducted to evaluate the performance of the designed algorithm. It was found that the improved NSGA-II exhibited superior convergence and diversity when applied to the test functions ZDT1-ZDT3. The mean construction period obtained from the model solution was 124 days, with a cost of 1,204,782 euros. The quality and safety levels achieved were 0.93 and 0.95, respectively, which were significantly better than those obtained by the NSGA-II. These findings demonstrate the reliability of the improved NSGA-II developed in this paper, suggesting its practical applicability

Authors

Institutions

Publication Details

Journal
Archives of Civil Engineering
Published
2025-09-22
DOI
https://doi.org/10.24425/ace.2025.155101
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective optimization of construction project management based on an improved genetic algorithm

Weishi Xia, Xiaoyan Dai, Yingwen Xu
Archives of Civil Engineering
BIM and Construction Integration
article

Multi-objective optimization of construction project management based on an improved genetic algorithm

Weishi Xia, Xiaoyan Dai, Yingwen Xu
article en

Abstract

In construction project management, it is crucial to consider multiple objectives, such as duration and cost, to develop an optimal plan. This paper established a multi-objective optimization model, taking into account the construction period, cost, safety, and quality of projects. A genetic algorithm (GA) was selected as the solution method, and the non-dominated sorting genetic algorithm-II (NSGA-II) was optimized by cat mapping, adaptive crossover, and mutation operators to obtain an improved algorithm for the model solution. Experiments were conducted to evaluate the performance of the designed algorithm. It was found that the improved NSGA-II exhibited superior convergence and diversity when applied to the test functions ZDT1-ZDT3. The mean construction period obtained from the model solution was 124 days, with a cost of 1,204,782 euros. The quality and safety levels achieved were 0.93 and 0.95, respectively, which were significantly better than those obtained by the NSGA-II. These findings demonstrate the reliability of the improved NSGA-II developed in this paper, suggesting its practical applicability

Archives of Civil Engineering
Wuhan Science and Technology Bureau (CN), Hubei University of Education (CN)
Openalex Percentile: Top 72%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multi-objective optimization of construction project management based on an improved genetic algorithm — Weishi Xia, Xiaoyan Dai, et al. · Archives of Civil Engineering (2025) | TGRS Research Map | TGRS