Effect of shot blasting parameters on corrosion resistance and de-rusting effectiveness in welded zones

Welded zones often show poor de-rusting results due to geometric discontinuities and metallurgical inhomogeneity. While shot blasting can effectively treat these areas, most studies focus on flat base metals and lack a systematic analysis of process parameters. In this study, immersion corrosion tests, shot blasting experiments, and electrochemical tests were performed on welded specimens to assess the effect of blasting duration on corrosion resistance. A finite element model was developed to evaluate the influence of blasting velocity, diameter, and angle on de-rusting effectiveness. Results show that corrosion resistance first improves and then declines with longer blasting time, suggesting an optimal blasting duration. Velocity, diameter, and angle were identified as the main factors affecting rust removal, roughness, and residual stress, with blasting angle having the most significant overall impact and thus deserving priority in process optimisation.

Authors

Institutions

Publication Details

Journal
Corrosion Engineering Science and Technology The International Journal of Corrosion Processes and Corrosion Control
Published
2025-09-22
DOI
https://doi.org/10.1177/1478422x251378549
Primary Topic
Material Properties and Failure Mechanisms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of shot blasting parameters on corrosion resistance and de-rusting effectiveness in welded zones

Bohai Ji, Yefei Li, Zhendong Li, Zhongqiu Fu et al.
Corrosion Engineering Science and Technology The International Journal of Corrosion Processes and Corrosion Control
Material Properties and Failure Mechanisms
article

Effect of shot blasting parameters on corrosion resistance and de-rusting effectiveness in welded zones

Bohai Ji, Yefei Li, Zhendong Li, Zhongqiu Fu, Yue Yao
article en

Abstract

Welded zones often show poor de-rusting results due to geometric discontinuities and metallurgical inhomogeneity. While shot blasting can effectively treat these areas, most studies focus on flat base metals and lack a systematic analysis of process parameters. In this study, immersion corrosion tests, shot blasting experiments, and electrochemical tests were performed on welded specimens to assess the effect of blasting duration on corrosion resistance. A finite element model was developed to evaluate the influence of blasting velocity, diameter, and angle on de-rusting effectiveness. Results show that corrosion resistance first improves and then declines with longer blasting time, suggesting an optimal blasting duration. Velocity, diameter, and angle were identified as the main factors affecting rust removal, roughness, and residual stress, with blasting angle having the most significant overall impact and thus deserving priority in process optimisation.

Corrosion Engineering Science and Technology The International Journal of Corrosion Processes and Corrosion Control
Hohai University (CN), Hong Kong Metropolitan University (HK)
Openalex Percentile: Top 80%
Material Properties and Failure Mechanisms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.