The optimal repair policy for an unreliable production system with limited available spare parts

In this study, a serial production system consisting of two machines and an intermediate finite buffer is considered. The machines have random processing times, and each machine contains one unit of a common critical component that is subject to random breakdown. Broken components must be replaced from an inventory of ready-for-use spare parts to restore machine functionality. This inventory is replenished according to a one-for-one replenishment policy with an externally given base stock level. Due to the limited availability of spare parts, the sequence in which the machines are to be repaired and whether they should be repaired immediately must be decided. The objective of our study is the maximization of the expected total discounted revenue per time unit over an infinite planning horizon. We model the system as a semi-Markov decision process and characterize the optimal stationary repair policy. We show that the first-break-first-repair policy is not optimal and provide numerical evidence that the optimal repair decision depends on the number of units in the buffer and the number of available spare parts. We show that, in some system states, it is optimal to postpone repair of a machine and reserve spare parts for the other machine. Since the optimal repair policy is state-dependent and quite complex, we investigate different prioritization heuristics from the literature in a numerical study. Our experiments suggest that heuristics achieve excellent performance in practical settings. • We consider the repair problem for flow lines with shared spare part inventories. • We formulate the problem as a Markov decision process. • We conjecture the structure of optimal repair policies which may reserve spare parts. • Numerical experiments suggest good performance of policies without reservations.

Authors

Institutions

Publication Details

Journal
European Journal of Operational Research
Published
2025-09-22
DOI
https://doi.org/10.1016/j.ejor.2025.09.007
Primary Topic
Operations Management Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The optimal repair policy for an unreliable production system with limited available spare parts

Gudrun P. Kiesmüller, Filip Malmberg, Ludwig Brieditis
European Journal of Operational Research
Operations Management Techniques
article

The optimal repair policy for an unreliable production system with limited available spare parts

Gudrun P. Kiesmüller, Filip Malmberg, Ludwig Brieditis
article en

Abstract

In this study, a serial production system consisting of two machines and an intermediate finite buffer is considered. The machines have random processing times, and each machine contains one unit of a common critical component that is subject to random breakdown. Broken components must be replaced from an inventory of ready-for-use spare parts to restore machine functionality. This inventory is replenished according to a one-for-one replenishment policy with an externally given base stock level. Due to the limited availability of spare parts, the sequence in which the machines are to be repaired and whether they should be repaired immediately must be decided. The objective of our study is the maximization of the expected total discounted revenue per time unit over an infinite planning horizon. We model the system as a semi-Markov decision process and characterize the optimal stationary repair policy. We show that the first-break-first-repair policy is not optimal and provide numerical evidence that the optimal repair decision depends on the number of units in the buffer and the number of available spare parts. We show that, in some system states, it is optimal to postpone repair of a machine and reserve spare parts for the other machine. Since the optimal repair policy is state-dependent and quite complex, we investigate different prioritization heuristics from the literature in a numerical study. Our experiments suggest that heuristics achieve excellent performance in practical settings. • We consider the repair problem for flow lines with shared spare part inventories. • We formulate the problem as a Markov decision process. • We conjecture the structure of optimal repair policies which may reserve spare parts. • Numerical experiments suggest good performance of policies without reservations.

European Journal of Operational ResearchVol. 330(3)
Lund University (SE), Heilbronn University (DE), Technical University of Munich (DE)
Openalex Percentile: Top 70%
Operations Management Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.