Power Outage Analysis in Electricity Distribution Network: A Case Study of Dugbe Business Unit, Ibadan, Nigeria.

Abstract: This study examines outage patterns in the Dugbe Business Unit of the Ibadan Electricity Distribution Company (IBEDC) to highlight reliability challenges and operational improvements at the distribution level within a large Nigerian franchise area. It combines quantitative reliability metrics, such as System Interruption Duration Index (SAIDI), System Average Interruption Frequency Index (SAIFI), and Consumer Average Interruption Duration Index (CAIDI), with qualitative data from stakeholder surveys, interviews, and archival records to analyse outage frequency, duration, and restoration performance. The study identifies key technical and operational factors driving outages. From 2021 to 2024, SAIFI decreased from 520 to 390 interruptions per customer, while SAIDI dropped from 2,800 to 2,200 hours per customer; CAIDI increased slightly from 5.38 to 5.64 hours. The year-to-date figures for 2025 show similar trends: 250 SAIFI, 1,500 SAIDI, and 6.00 CAIDI. These patterns suggest that prevention measures have improved more quickly than restoration efforts, resulting in fewer outages and lower total disruption, but with slightly longer average restoration times. Root cause analysis reveals that certain technical factors- such as air-conditioning equipment, capacitors, cabling, conductors, transformers, and low-voltage lines- as well as random drivers, explain a significant portion of outages, with a persistent downstream pattern at one substation. We recommend a dual approach: enhance event prevention through risk-based and condition-based maintenance, along with targeted undergrounding, while also streamlining restoration processes via automation, OMS/SCADA workflows, staging crews, and spare parts, as well as standard switching procedures. Although focused on distribution outages and limited by the preliminary nature of the 2025 year-to-date data, this analysis provides a practical model for improving reliability and governance at the feeder and business-unit levels.

Authors

Institutions

Publication Details

Journal
International Journal of Latest Technology in Engineering Management & Applied Science
Published
2025-09-22
DOI
https://doi.org/10.51583/ijltemas.2025.1408000182
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Power Outage Analysis in Electricity Distribution Network: A Case Study of Dugbe Business Unit, Ibadan, Nigeria.

Adeyinka Adebayo, Ismaheel Oyeyemi Oladejo, Hussein Kehinde Adebayo, Pelumi Peter Aluko-Olokun.
International Journal of Latest Technology in Engineering Management & Applied Science
Power System Reliability and Maintenance
article

Power Outage Analysis in Electricity Distribution Network: A Case Study of Dugbe Business Unit, Ibadan, Nigeria.

Adeyinka Adebayo, Ismaheel Oyeyemi Oladejo, Hussein Kehinde Adebayo, Pelumi Peter Aluko-Olokun.
article en

Abstract

Abstract: This study examines outage patterns in the Dugbe Business Unit of the Ibadan Electricity Distribution Company (IBEDC) to highlight reliability challenges and operational improvements at the distribution level within a large Nigerian franchise area. It combines quantitative reliability metrics, such as System Interruption Duration Index (SAIDI), System Average Interruption Frequency Index (SAIFI), and Consumer Average Interruption Duration Index (CAIDI), with qualitative data from stakeholder surveys, interviews, and archival records to analyse outage frequency, duration, and restoration performance. The study identifies key technical and operational factors driving outages. From 2021 to 2024, SAIFI decreased from 520 to 390 interruptions per customer, while SAIDI dropped from 2,800 to 2,200 hours per customer; CAIDI increased slightly from 5.38 to 5.64 hours. The year-to-date figures for 2025 show similar trends: 250 SAIFI, 1,500 SAIDI, and 6.00 CAIDI. These patterns suggest that prevention measures have improved more quickly than restoration efforts, resulting in fewer outages and lower total disruption, but with slightly longer average restoration times. Root cause analysis reveals that certain technical factors- such as air-conditioning equipment, capacitors, cabling, conductors, transformers, and low-voltage lines- as well as random drivers, explain a significant portion of outages, with a persistent downstream pattern at one substation. We recommend a dual approach: enhance event prevention through risk-based and condition-based maintenance, along with targeted undergrounding, while also streamlining restoration processes via automation, OMS/SCADA workflows, staging crews, and spare parts, as well as standard switching procedures. Although focused on distribution outages and limited by the preliminary nature of the 2025 year-to-date data, this analysis provides a practical model for improving reliability and governance at the feeder and business-unit levels.

International Journal of Latest Technology in Engineering Management & Applied ScienceVol. 14(8)
University of Johannesburg (ZA), The Polytechnic Ibadan (NG), Lead City University (NG), Sheffield Hallam University (GB)
Openalex Percentile: Top 69%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.